Laserfiche WebLink
necessary for giving notice of or filing a data" or any such other data, <br /> mechanic's or construction lien against such interpretations,opinions,or information. <br /> lands in accordance with applicable Laws and <br /> Regulations. 4.03 Differing Subsurface or Physical Conditions <br /> C. Contractor shall provide for all additional A. Notice: If Contractor believes that any <br /> lands and access thereto that may be required subsurface or physical condition at or <br /> for temporary construction facilities or storage contiguous to the Site that is uncovered or <br /> of materials and equipment. revealed either: <br /> 4.02 Subsurface and Physical Conditions 1. is of such a nature as to establish that any <br /> "technical data" on which Contractor is <br /> A. Reports and Drawings: The Supplementary entitled to rely as provided in Paragraph <br /> Conditions identify: 4.02 is materially inaccurate;or <br /> L those reports of explorations and tests of 2. is of such a nature as to require a change <br /> subsurface conditions at or contiguous to in the Contract Documents;or <br /> the Site that Engineer has used in <br /> preparing the Contract Documents;and 3. differs materially from that shown or <br /> indicated in the Contract Documents;or <br /> 2. those drawings of physical conditions in <br /> or relating to existing surface or 4. is of an unusual nature, and differs <br /> subsurface structures at or contiguous to materially from conditions ordinarily <br /> the Site (except Underground Facilities) encountered and generally recognized as <br /> that Engineer has used in preparing the inherent in work of the character <br /> Contract Documents. provided for in the Contract Documents; <br /> then Contractor shall, promptly after <br /> B. Limited Reliance by Contractor on Technical becoming aware thereof and before <br /> Data Authorized: Contractor may rely upon further disturbing the subsurface or <br /> the general accuracy of the "technical data" physical conditions or performing any <br /> contained in such reports and drawings, but Work in connection therewith(except in <br /> such reports and drawings are not Contract an emergency as required by Paragraph <br /> Documents. Such "technical data" is 6.16.A), notify Owner and Engineer in <br /> identified in the Supplementary Conditions. writing about such condition. Contractor <br /> Except for such reliance on such "technical shall not further disturb such condition or <br /> data," Contractor may not rely upon or make perform any Work in connection <br /> any claim against Owner or Engineer, or any therewith (except as aforesaid) until <br /> of their Related Entities with respect to: receipt of written order to do so. <br /> L the completeness of such reports and B. Engineer's Review: After receipt of written <br /> drawings for Contractor's purposes, notice as required by Paragraph 4.03.A, <br /> including, but not limited to, any aspects Engineer will promptly review the pertinent <br /> of the means, methods, techniques, condition,determine the necessity of Owner's <br /> sequences, and procedures of obtaining additional exploration or tests with <br /> construction to be employed by respect thereto, and advise Owner in writing <br /> Contractor, and safety precautions and (with a copy to Contractor) of Engineer's <br /> programs incident thereto;or findings and conclusions. <br /> 2. other data, interpretations, opinions, and C. Possible Price and Times Adjustments <br /> information contained in such reports or <br /> shown or indicated in such drawings;or 1. The Contract Price or the Contract <br /> Times,or both,will be equitably adjusted <br /> 3. any Contractor interpretation of or to the extent that the existence of such <br /> conclusion drawn from any "technical differing subsurface or physical condition <br /> causes an increase or decrease in <br /> Standard General Conditions <br /> 00 72 00-9 <br />