Laserfiche WebLink
Contractor's cost of,or time required for, or other dispute resolution costs) <br /> performance of the Work; subject, sustained by Contractor on or in <br /> however,to the following: connection with any other project or <br /> anticipated project. <br /> a. such condition must meet any one or <br /> more of the categories described in 4.04 Underground Facilities <br /> Paragraph 4.03.A;and <br /> A. Shown or Indicated: The information and <br /> b. with respect to Work that is paid for data shown or indicated in the Contract <br /> on a Unit Price Basis, any Documents with respect to existing <br /> adjustment in Contract Price will be Underground Facilities at or contiguous to the <br /> subject to the provisions of Site is based on information and data <br /> Paragraphs 9.07 and 11.03. furnished to Owner or Engineer by the owners <br /> of such Underground Facilities, including <br /> 2. Contractor shall not be entitled to any Owner, or by others. Unless it is otherwise <br /> adjustment in the Contract Price or expressly provided in the Supplementary <br /> Contract Times if. Conditions: <br /> a. Contractor knew of the existence of 1. Owner and Engineer shall not be <br /> such conditions at the time responsible for the accuracy or <br /> Contractor made a final commitment completeness of any such information or <br /> to Owner with respect to Contract data;and <br /> Price and Contract Times by the <br /> submission of a Bid or becoming 2. the cost of all of the following will be <br /> bound under a negotiated contract; included in the Contract Price, and <br /> or Contractor shall have full responsibility <br /> for: <br /> b. the existence of such condition could <br /> reasonably have been discovered or a. reviewing and checking all such <br /> revealed as a result of any information and data, <br /> examination, investigation, <br /> exploration,test, or study of the Site b. locating all Underground Facilities <br /> and contiguous areas required by the shown or indicated in the Contract <br /> Bidding Requirements or Contract Documents, <br /> Documents to be conducted by or <br /> for Contractor prior to Contractor's c. coordination of the Work with the <br /> making such final commitment;or owners of such Underground <br /> Facilities, including Owner, during <br /> c. Contractor failed to give the written construction,and <br /> notice as required by Paragraph <br /> 4.03.A. d. the safety and protection of all such <br /> Underground Facilities and repairing <br /> 3. If Owner and Contractor are unable to any damage thereto resulting from <br /> agree on entitlement to or on the amount the Work. <br /> or extent,if any,of any adjustment in the <br /> Contract Price or Contract Times, or B. Not Shown or Indicated <br /> both, a Claim may be made therefor as <br /> provided in Paragraph 10.05. However, 1. If an Underground Facility is uncovered <br /> Owner and Engineer, and any of their or revealed at or contiguous to the Site <br /> Related Entities shall not be liable to which was not shown or indicated,or not <br /> Contractor for any claims, costs, losses, shown or indicated with reasonable <br /> or damages (including but not limited to accuracy in the Contract Documents, <br /> all fees and charges of engineers, Contractor shall, promptly after <br /> architects, attorneys, and other becoming aware thereof and before <br /> professionals and all court or arbitration further disturbing conditions affected <br /> Standard General Conditions <br /> 00 72 00-10 <br />