My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
thereby or performing any Work in necessary changes in grades or locations, and <br /> connection therewith (except in an shall be responsible for the accurate <br /> emergency as required by Paragraph replacement or relocation of such reference <br /> 6.16.A), identify the owner of such points or property monuments by <br /> Underground Facility and give written professionally qualified personnel. <br /> notice to that owner and to Owner and <br /> Engineer. Engineer will promptly review 4.06 Hazardous Environmental Condition at Site <br /> the Underground Facility and determine <br /> the extent, if any, to which a change is A. Reports and Drawings: Reference is made to <br /> required in the Contract Documents to the Supplementary Conditions for the <br /> reflect and document the consequences of identification of those reports and drawings <br /> the existence or location of the relating to a Hazardous Environmental <br /> Underground Facility. During such time, Condition identified at the Site, if any, that <br /> Contractor shall be responsible for the have been utilized by the Engineer in the <br /> safety and protection of such preparation of the Contract Documents. <br /> Underground Facility. <br /> B. Limited Reliance by Contractor on Technical <br /> 2. If Engineer concludes that a change in Data Authorized: Contractor may rely upon <br /> the Contract Documents is required, a the general accuracy of the "technical data" <br /> Work Change Directive or a Change contained in such reports and drawings, but <br /> Order will be issued to reflect and such reports and drawings are not Contract <br /> document such consequences. An Documents. Such "technical data" is <br /> equitable adjustment shall be made in the identified in the Supplementary Conditions. <br /> Contract Price or Contract Times, or Except for such reliance on such "technical <br /> both, to the extent that they are data," Contractor may not rely upon or make <br /> attributable to the existence or location of any claim against Owner or Engineer, or any <br /> any Underground Facility that was not of their Related Entities with respect to: <br /> shown or indicated or not shown or <br /> indicated with reasonable accuracy in the L the completeness of such reports and <br /> Contract Documents and that Contractor drawings for Contractor's purposes, <br /> did not know of and could not reasonably including, but not limited to, any aspects <br /> have been expected to be aware of or to of the means, methods, techniques, <br /> have anticipated. If Owner and sequences and procedures of construction <br /> Contractor are unable to agree on to be employed by Contractor and safety <br /> entitlement to or on the amount or extent, precautions and programs incident <br /> if any,of any such adjustment in Contract thereto;or <br /> Price or Contract Times, Owner or <br /> Contractor may make a Claim therefor as 2. other data, interpretations, opinions and <br /> provided in Paragraph 10.05. information contained in such reports or <br /> shown or indicated in such drawings;or <br /> 4.05 Reference Points <br /> 3. any Contractor interpretation of or <br /> A. Owner shall provide engineering surveys to conclusion drawn from any "technical <br /> establish reference points for construction data" or any such other data, <br /> which in Engineer's judgment are necessary interpretations,opinions or information. <br /> to enable Contractor to proceed with the <br /> Work. Contractor shall be responsible for C. Contractor shall not be responsible for any <br /> laying out the Work, shall protect and Hazardous Environmental Condition <br /> preserve the established reference points and uncovered or revealed at the Site which was <br /> property monuments, and shall make no not shown or indicated in Drawings or <br /> changes or relocations without the prior Specifications or identified in the Contract <br /> written approval of Owner. Contractor shall Documents to be within the scope of the <br /> report to Engineer whenever any reference Work. Contractor shall be responsible for a <br /> point or property monument is lost or Hazardous Environmental Condition created <br /> destroyed or requires relocation because of with any materials brought to the Site by <br /> Standard General Conditions <br /> 00 72 00-11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.