Contractor, Subcontractors, Suppliers, or Work performed by Owner's own forces or
<br /> anyone else for whom Contractor is others in accordance with Article 7.
<br /> responsible.
<br /> G. To the fullest extent permitted by Laws and
<br /> D. If Contractor encounters a Hazardous Regulations, Owner shall indemnify and hold
<br /> Environmental Condition or if Contractor or harmless Contractor, Subcontractors, and
<br /> anyone for whom Contractor is responsible Engineer, and the officers, directors,partners,
<br /> creates a Hazardous Environmental employees, agents, consultants, and
<br /> Condition, Contractor shall immediately: (i) subcontractors of each and any of them from
<br /> secure or otherwise isolate such condition;(ii) and against all claims, costs, losses, and
<br /> stop all Work in connection with such damages (including but not limited to all fees
<br /> condition and in any area affected thereby and charges of engineers,architects,attorneys,
<br /> (except in an emergency as required by and other professionals and all court or
<br /> Paragraph 6.16.A);and(iii)notify Owner and arbitration or other dispute resolution costs)
<br /> Engineer (and promptly thereafter confirm arising out of or relating to a Hazardous
<br /> such notice in writing). Owner shall promptly Environmental Condition, provided that such
<br /> consult with Engineer concerning the Hazardous Environmental Condition: (i)was
<br /> necessity for Owner to retain a qualified not shown or indicated in the Drawings or
<br /> expert to evaluate such condition or take Specifications or identified in the Contract
<br /> corrective action,if any. Documents to be included within the scope of
<br /> the Work, and (ii) was not created by
<br /> E. Contractor shall not be required to resume Contractor or by anyone for whom Contractor
<br /> Work in connection with such condition or in is responsible.Nothing in this Paragraph 4.06.
<br /> any affected area until after Owner has G shall obligate Owner to indemnify any
<br /> obtained any required permits related thereto individual or entity from and against the
<br /> and delivered to Contractor written notice: (i) consequences of that individual's or entity's
<br /> specifying that such condition and any own negligence.
<br /> affected area is or has been rendered safe for
<br /> the resumption of Work;or(ii)specifying any H. To the fullest extent permitted by Laws and
<br /> special conditions under which such Work Regulations, Contractor shall indemnify and
<br /> may be resumed safely. If Owner and hold harmless Owner and Engineer, and the
<br /> Contractor cannot agree as to entitlement to or officers, directors, partners, employees,
<br /> on the amount or extent, if any, of any agents, consultants, and subcontractors of
<br /> adjustment in Contract Price or Contract each and any of them from and against all
<br /> Times, or both, as a result of such Work claims, costs, losses, and damages (including
<br /> stoppage or such special conditions under but not limited to all fees and charges of
<br /> which Work is agreed to be resumed by engineers, architects, attorneys, and other
<br /> Contractor, either party may make a Claim professionals and all court or arbitration or
<br /> therefor as provided in Paragraph 10.05. other dispute resolution costs) arising out of
<br /> or relating to a Hazardous Environmental
<br /> F. If after receipt of such written notice Condition created by Contractor or by anyone
<br /> Contractor does not agree to resume such for whom Contractor is responsible. Nothing
<br /> Work based on a reasonable belief it is in this Paragraph 4.06.1-1 shall obligate
<br /> unsafe, or does not agree to resume such Contractor to indemnify any individual or
<br /> Work under such special conditions, then entity from and against the consequences of
<br /> Owner may order the portion of the Work that that individual's or entity's own negligence.
<br /> is in the area affected by such condition to be
<br /> deleted from the Work. If Owner and I. The provisions of Paragraphs 4.02, 4.03, and
<br /> Contractor cannot agree as to entitlement to or 4.04 do not apply to a Hazardous
<br /> on the amount or extent, if any, of an Environmental Condition uncovered or
<br /> adjustment in Contract Price or Contract revealed at the Site.
<br /> Times as a result of deleting such portion of
<br /> the Work,then either party may make a Claim
<br /> therefor as provided in Paragraph 10.05.
<br /> Owner may have such deleted portion of the
<br /> Standard General Conditions
<br /> 00 72 00-12
<br />
|