Laserfiche WebLink
thereof covered by an appropriate Change 5.10 Partial Utilization, Acknowledgment of Property <br /> Order. Insurer <br /> B. Owner as fiduciary shall have power to adjust A. If Owner finds it necessary to occupy or use a <br /> and settle any loss with the insurers unless one portion or portions of the Work prior to <br /> of the parties in interest shall object in writing Substantial Completion of all the Work as <br /> within 15 days after the occurrence of loss to provided in Paragraph 14.05, no such use or <br /> Owner's exercise of this power. If such occupancy shall commence before the <br /> objection be made, Owner as fiduciary shall insurers providing the property insurance <br /> make settlement with the insurers in pursuant to Paragraph 5.06 have <br /> accordance with such agreement as the parties acknowledged notice thereof and in writing <br /> in interest may reach. If no such agreement effected any changes in coverage necessitated <br /> among the parties in interest is reached, thereby. The insurers providing the property <br /> Owner as fiduciary shall adjust and settle the insurance shall consent by endorsement on the <br /> loss with the insurers and, if required in policy or policies, but the property insurance <br /> writing by any party in interest, Owner as shall not be canceled or pemlitted to lapse on <br /> fiduciary shall give bond for the proper account of any such partial use or occupancy. <br /> performance of such duties. <br /> ARTICLE 6—CONTRACTOR'S <br /> 5.09 Acceptance of Bonds and Insurance; Option to RESPONSIBILITIES <br /> Replace <br /> 6.01 Supervision and Superintendence <br /> A. If either Owner or Contractor has any <br /> objection to the coverage afforded by or other A. Contractor shall supervise, inspect, and direct <br /> provisions of the bonds or insurance required the Work competently and efficiently, <br /> to be purchased and maintained by the other devoting such attention thereto and applying <br /> party in accordance with Article 5 on the basis such skills and expertise as may be necessary <br /> of non-conformance with the Contract to perform the Work in accordance with the <br /> Documents,the objecting party shall so notify Contract Documents. Contractor shall be <br /> the other party in writing within 10 days after solely responsible for the means, methods, <br /> receipt of the certificates (or other evidence techniques, sequences, and procedures of <br /> requested) required by Paragraph 2.01.13. construction. Contractor shall not be <br /> Owner and Contractor shall each provide to responsible for the negligence of Owner or <br /> the other such additional information in Engineer in the design or specification of a <br /> respect of insurance provided as the other specific means, method, technique, sequence, <br /> may reasonably request. If either party does or procedure of construction which is shown <br /> not purchase or maintain all of the bonds and or indicated in and expressly required by the <br /> insurance required of such party by the Contract Documents. <br /> Contract Documents, such party shall notify <br /> the other party in writing of such failure to B. At all times during the progress of the Work, <br /> purchase prior to the start of the Work, or of Contractor shall assign a competent resident <br /> such failure to maintain prior to any change in superintendent who shall not be replaced <br /> the required coverage. Without prejudice to without written notice to Owner and Engineer <br /> any other right or remedy,the other party may except under extraordinary circumstances. <br /> elect to obtain equivalent bonds or insurance The superintendent will be Contractor's <br /> to protect such other party's interests at the representative at the Site and shall have <br /> expense of the party who was required to authority to act on behalf of Contractor. All <br /> provide such coverage, and a Change Order communications given to or received from the <br /> shall be issued to adjust the Contract Price superintendent shall be binding on Contractor. <br /> accordingly. <br /> 6.02 Labor; Working Hours <br /> A. Contractor shall provide competent, suitably <br /> qualified personnel to survey and lay out the <br /> Work and perform construction as required by <br /> Standard General Conditions <br /> 00 72 00-17 <br />