the Contract Documents. Contractor shall at 1. Contractor shall submit to Engineer for
<br /> all times maintain good discipline and order at acceptance (to the extent indicated in
<br /> the Site. Paragraph 2.07)proposed adjustments in
<br /> the Progress Schedule that will not result
<br /> B. Except as otherwise required for the safety or in changing the Contract Times. Such
<br /> protection of persons or the Work or property adjustments will comply with any
<br /> at the Site or adjacent thereto, and except as provisions of the General Requirements
<br /> otherwise stated in the Contract Documents, applicable thereto.
<br /> all Work at the Site shall be performed during
<br /> regular working hours. Contractor will not 2. Proposed adjustments in the Progress
<br /> permit the performance of Work on a Schedule that will change the Contract
<br /> Saturday, Sunday, or any legal holiday Times shall be submitted in accordance
<br /> without Owner's written consent (which will with the requirements of Article 12.
<br /> not be unreasonably withheld) given after Adjustments in Contract Times may only
<br /> prior written notice to Engineer. be made by a Change Order.
<br /> 6.03 Services,Materials, and Equipment 6.05 Substitutes and "Or-Equals"
<br /> A. Unless otherwise specified in the Contract A. Whenever an item of material or equipment is
<br /> Documents, Contractor shall provide and specified or described in the Contract
<br /> assume full responsibility for all services, Documents by using the name of a proprietary
<br /> materials, equipment, labor, transportation, item or the name of a particular Supplier,the
<br /> construction equipment and machinery, tools, specification or description is intended to
<br /> appliances,fuel,power,light,heat,telephone, establish the type, function, appearance, and
<br /> water, sanitary facilities, temporary facilities, quality required. Unless the specification or
<br /> and all other facilities and incidentals description contains or is followed by words
<br /> necessary for the performance, testing, reading that no like, equivalent, or"or-equal"
<br /> start-up,and completion of the Work. item or no substitution is permitted, other
<br /> items of material or equipment or material or
<br /> B. All materials and equipment incorporated into equipment of other Suppliers may be
<br /> the Work shall be as specified or, if not submitted to Engineer for review under the
<br /> specified, shall be of good quality and new, circumstances described below.
<br /> except as otherwise provided in the Contract
<br /> Documents. All special warranties and 1. "Or-Equal"Items: If in Engineer's sole
<br /> guarantees required by the Specifications shall discretion an item of material or
<br /> expressly run to the benefit of Owner. If equipment proposed by Contractor is
<br /> required by Engineer,Contractor shall furnish functionally equal to that named and
<br /> satisfactory evidence (including reports of sufficiently similar so that no change in
<br /> required tests) as to the source, kind, and related Work will be required, it may be
<br /> quality of materials and equipment. considered by Engineer as an "or-equal"
<br /> item, in which case review and approval
<br /> C. All materials and equipment shall be stored, of the proposed item may, in Engineer's
<br /> applied, installed, connected, erected, sole discretion, be accomplished without
<br /> protected, used, cleaned, and conditioned in compliance with some or all of the
<br /> accordance with instructions of the applicable requirements for approval of proposed
<br /> Supplier, except as otherwise may be substitute items. For the purposes of this
<br /> provided in the Contract Documents. Paragraph 6.05.A.1, a proposed item of
<br /> material or equipment will be considered
<br /> 6.04 Progress Schedule functionally equal to an item so named if:
<br /> A. Contractor shall adhere to the Progress a. in the exercise of reasonable
<br /> Schedule established in accordance with judgment Engineer determines that:
<br /> Paragraph 2.07 as it may be adjusted from
<br /> time to time as provided below. 1) it is at least equal in materials of
<br /> construction, quality, durability,
<br /> Standard General Conditions
<br /> 00 72 00-18