My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
appearance,strength,and design d. Contractor shall make written <br /> characteristics; application to Engineer for review of <br /> a proposed substitute item of <br /> 2) it will reliably perform at least material or equipment that <br /> equally well the function and Contractor seeks to furnish or use. <br /> achieve the results imposed by The application: <br /> the design concept of the <br /> completed Project as a 1) shall certify that the proposed <br /> functioning whole, substitute item will: <br /> 3) it has a proven record of a) perform adequately the <br /> performance and availability of functions and achieve the <br /> responsive service;and results called for by the <br /> general design, <br /> b. Contractor certifies that, if approved <br /> and incorporated into the Work: b) be similar in substance to <br /> that specified,and <br /> 1) there will be no increase in cost <br /> to the Owner or increase in c) be suited to the same use as <br /> Contract Times,and that specified; <br /> 2) it will conform substantially to 2) will state: <br /> the detailed requirements of the <br /> item named in the Contract a) the extent, if any, to which <br /> Documents. the use of the proposed <br /> substitute item will <br /> 2. Substitute Items prejudice Contractor's <br /> achievement of Substantial <br /> a. If in Engineer's sole discretion an Completion on time; <br /> item of material or equipment <br /> proposed by Contractor does not b) whether or not use of the <br /> qualify as an "or-equal" item under proposed substitute item in <br /> Paragraph 6.05.A.1, it will be the Work will require a <br /> considered a proposed substitute change in any of the <br /> item. Contract Documents (or in <br /> the provisions of any other <br /> b. Contractor shall submit sufficient direct contract with Owner <br /> information as provided below to for other work on the <br /> allow Engineer to determine that the Project)to adapt the design <br /> item of material or equipment to the proposed substitute <br /> proposed is essentially equivalent to item;and <br /> that named and an acceptable <br /> substitute therefor. Requests for c) whether or not <br /> review of proposed substitute items incorporation or use of the <br /> of material or equipment will not be proposed substitute item in <br /> accepted by Engineer from anyone connection with the Work <br /> other than Contractor. is subject to payment of <br /> any license fee or royalty; <br /> c. The requirements for review by <br /> Engineer will be as set forth in 3) will identify: <br /> Paragraph 6.05.A.2.d, as <br /> supplemented in the General a) all variations of the <br /> Requirements and as Engineer may proposed substitute item <br /> decide is appropriate under the from that specified,and <br /> circumstances. <br /> Standard General Conditions <br /> 00 72 00-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.