Laserfiche WebLink
b) available engineering, a substitute item so proposed or submitted by <br /> sales, maintenance, repair, Contractor,Contractor shall reimburse Owner <br /> and replacement services; for the charges of Engineer for evaluating <br /> each such proposed substitute. Contractor <br /> 4) and shall contain an itemized shall also reimburse Owner for the charges of <br /> estimate of all costs or credits Engineer for making changes in the Contract <br /> that will result directly or Documents (or in the provisions of any other <br /> indirectly from use of such direct contract with Owner)resulting from the <br /> substitute item, including costs acceptance of each proposed substitute. <br /> of redesign and claims of other <br /> contractors affected by any F. Contractor's Expense: Contractor shall <br /> resulting change, provide all data in support of any proposed <br /> substitute or "or-equal" at Contractor's <br /> B. Substitute Construction Methods or expense. <br /> Procedures: If a specific means, method, <br /> technique, sequence, or procedure of 6.06 Concerning Subcontractors,Suppliers, and Others <br /> construction is expressly required by the <br /> Contract Documents, Contractor may furnish A. Contractor shall not employ any <br /> or utilize a substitute means, method, Subcontractor,Supplier,or other individual or <br /> technique, sequence, or procedure of entity(including those acceptable to Owner as <br /> construction approved by Engineer. indicated in Paragraph 6.06.13), whether <br /> Contractor shall submit sufficient information initially or as a replacement, against whom <br /> to allow Engineer, in Engineer's sole Owner may have reasonable objection. <br /> discretion, to determine that the substitute Contractor shall not be required to employ <br /> proposed is equivalent to that expressly called any Subcontractor, Supplier, or other <br /> for by the Contract Documents. The individual or entity to furnish or perform any <br /> requirements for review by Engineer will be of the Work against whom Contractor has <br /> similar to those provided in Paragraph reasonable objection. <br /> 6.05.A.2. <br /> B. If the Supplementary Conditions require the <br /> C. Engineer's Evaluation: Engineer will be identity of certain Subcontractors, Suppliers, <br /> allowed a reasonable time within which to or other individuals or entities to be submitted <br /> evaluate each proposal or submittal made to Owner in advance for acceptance by Owner <br /> pursuant to Paragraphs 6.05.A and 6.05.13. by a specified date prior to the Effective Date <br /> Engineer may require Contractor to furnish of the Agreement, and if Contractor has <br /> additional data about the proposed substitute submitted a list thereof in accordance with the <br /> item. Engineer will be the sole judge of Supplementary Conditions, Owner's <br /> acceptability.No"or equal"or substitute will acceptance (either in writing or by failing to <br /> be ordered, installed or utilized until make written objection thereto by the date <br /> Engineer's review is complete, which will be indicated for acceptance or objection in the <br /> evidenced by either a Change Order for a Bidding Documents or the Contract <br /> substitute or an approved Shop Drawing for Documents) of any such Subcontractor, <br /> an"or equal."Engineer will advise Contractor Supplier, or other individual or entity so <br /> in writing of any negative determination. identified may be revoked on the basis of <br /> reasonable objection after due investigation. <br /> D. Special Guarantee: Owner may require Contractor shall submit an acceptable <br /> Contractor to fiummish at Contractor's expense replacement for the rejected Subcontractor, <br /> a special performance guarantee or other Supplier,or other individual or entity,and the <br /> surety with respect to any substitute. Contract Price will be adjusted by the <br /> difference in the cost occasioned by such <br /> E. Engineer's Cost Reimbursement: Engineer replacement, and an appropriate Change <br /> will record Engineer's costs in evaluating a Order will be issued . No acceptance by <br /> substitute proposed or submitted by Owner of any such Subcontractor, Supplier, <br /> Contractor pursuant to Paragraphs 6.05.A.2 or other individual or entity, whether initially <br /> and 6.05.13 Whether or not Engineer approves or as a replacement, shall constitute a waiver <br /> Standard General Conditions <br /> 00 72 00-20 <br />