legal or equitable, brought by any such safety precautions and programs in connection
<br /> owner or occupant against Owner, with the Work. Contractor shall take all
<br /> Engineer, or any other party indemnified necessary precautions for the safety of, and
<br /> hereunder to the extent caused by or shall provide the necessary protection to
<br /> based upon Contractor's performance of prevent damage,injury or loss to:
<br /> the Work.
<br /> 1. all persons on the Site or who may be
<br /> B. Removal of Debris During Performance of affected by the Work;
<br /> the Work: During the progress of the Work
<br /> Contractor shall keep the Site and other areas 2. all the Work and materials and
<br /> free from accumulations of waste materials, equipment to be incorporated therein,
<br /> rubbish, and other debris. Removal and whether in storage on or off the Site;and
<br /> disposal of such waste materials,rubbish,and
<br /> other debris shall conform to applicable Laws 3. other property at the Site or adjacent
<br /> and Regulations. thereto, including trees, shrubs, lawns,
<br /> walks, pavements, roadways, structures,
<br /> C. Cleaning: Prior to Substantial Completion of utilities, and Underground Facilities not
<br /> the Work Contractor shall clean the Site and designated for removal, relocation, or
<br /> the Work and make it ready for utilization by replacement in the course of construction.
<br /> Owner. At the completion of the Work
<br /> Contractor shall remove from the Site all B. Contractor shall comply with all applicable
<br /> tools, appliances, construction equipment and Laws and Regulations relating to the safety of
<br /> machinery, and surplus materials and shall persons or property, or to the protection of
<br /> restore to original condition all property not persons or property from damage, injury, or
<br /> designated for alteration by the Contract loss; and shall erect and maintain all
<br /> Documents. necessary safeguards for such safety and
<br /> protection. Contractor shall notify owners of
<br /> D. Loading Structures: Contractor shall not load adjacent property and of Underground
<br /> nor permit any part of any structure to be Facilities and other utility owners when
<br /> loaded in any manner that will endanger the prosecution of the Work may affect them,and
<br /> structure,nor shall Contractor subject any part shall cooperate with them in the protection,
<br /> of the Work or adjacent property to stresses or removal, relocation, and replacement of their
<br /> pressures that will endanger it. property.
<br /> 6.12 Record Documents C. All damage, injury, or loss to any property
<br /> referred to in Paragraph 6.13.A.2 or 6.13.A.3
<br /> A. Contractor shall maintain in a safe place at the caused, directly or indirectly, in whole or in
<br /> Site one record copy of all Drawings, part, by Contractor, any Subcontractor,
<br /> Specifications, Addenda, Change Orders, Supplier, or any other individual or entity
<br /> Work Change Directives, Field Orders, and directly or indirectly employed by any of them
<br /> written interpretations and clarifications in to perform any of the Work, or anyone for
<br /> good order and annotated to show changes whose acts any of them may be liable,shall be
<br /> made during construction. These record remedied by Contractor (except damage or
<br /> documents together with all approved loss attributable to the fault of Drawings or
<br /> Samples and a counterpart of all approved Specifications or to the acts or omissions of
<br /> Shop Drawings will be available to Engineer Owner or Engineer or, or anyone employed
<br /> for reference. Upon completion of the Work, by any of them,or anyone for whose acts any
<br /> these record documents, Samples, and Shop of them may be liable, and not attributable,
<br /> Drawings will be delivered to Engineer for directly or indirectly, in whole or in part, to
<br /> Owner. the fault or negligence of Contractor or any
<br /> Subcontractor,Supplier,or other individual or
<br /> 6.13 Safety and Protection entity directly or indirectly employed by any
<br /> of them).
<br /> A. Contractor shall be solely responsible for
<br /> initiating, maintaining and supervising all
<br /> Standard General Conditions
<br /> 00 72 00-23