Laserfiche WebLink
legal or equitable, brought by any such safety precautions and programs in connection <br /> owner or occupant against Owner, with the Work. Contractor shall take all <br /> Engineer, or any other party indemnified necessary precautions for the safety of, and <br /> hereunder to the extent caused by or shall provide the necessary protection to <br /> based upon Contractor's performance of prevent damage,injury or loss to: <br /> the Work. <br /> 1. all persons on the Site or who may be <br /> B. Removal of Debris During Performance of affected by the Work; <br /> the Work: During the progress of the Work <br /> Contractor shall keep the Site and other areas 2. all the Work and materials and <br /> free from accumulations of waste materials, equipment to be incorporated therein, <br /> rubbish, and other debris. Removal and whether in storage on or off the Site;and <br /> disposal of such waste materials,rubbish,and <br /> other debris shall conform to applicable Laws 3. other property at the Site or adjacent <br /> and Regulations. thereto, including trees, shrubs, lawns, <br /> walks, pavements, roadways, structures, <br /> C. Cleaning: Prior to Substantial Completion of utilities, and Underground Facilities not <br /> the Work Contractor shall clean the Site and designated for removal, relocation, or <br /> the Work and make it ready for utilization by replacement in the course of construction. <br /> Owner. At the completion of the Work <br /> Contractor shall remove from the Site all B. Contractor shall comply with all applicable <br /> tools, appliances, construction equipment and Laws and Regulations relating to the safety of <br /> machinery, and surplus materials and shall persons or property, or to the protection of <br /> restore to original condition all property not persons or property from damage, injury, or <br /> designated for alteration by the Contract loss; and shall erect and maintain all <br /> Documents. necessary safeguards for such safety and <br /> protection. Contractor shall notify owners of <br /> D. Loading Structures: Contractor shall not load adjacent property and of Underground <br /> nor permit any part of any structure to be Facilities and other utility owners when <br /> loaded in any manner that will endanger the prosecution of the Work may affect them,and <br /> structure,nor shall Contractor subject any part shall cooperate with them in the protection, <br /> of the Work or adjacent property to stresses or removal, relocation, and replacement of their <br /> pressures that will endanger it. property. <br /> 6.12 Record Documents C. All damage, injury, or loss to any property <br /> referred to in Paragraph 6.13.A.2 or 6.13.A.3 <br /> A. Contractor shall maintain in a safe place at the caused, directly or indirectly, in whole or in <br /> Site one record copy of all Drawings, part, by Contractor, any Subcontractor, <br /> Specifications, Addenda, Change Orders, Supplier, or any other individual or entity <br /> Work Change Directives, Field Orders, and directly or indirectly employed by any of them <br /> written interpretations and clarifications in to perform any of the Work, or anyone for <br /> good order and annotated to show changes whose acts any of them may be liable,shall be <br /> made during construction. These record remedied by Contractor (except damage or <br /> documents together with all approved loss attributable to the fault of Drawings or <br /> Samples and a counterpart of all approved Specifications or to the acts or omissions of <br /> Shop Drawings will be available to Engineer Owner or Engineer or, or anyone employed <br /> for reference. Upon completion of the Work, by any of them,or anyone for whose acts any <br /> these record documents, Samples, and Shop of them may be liable, and not attributable, <br /> Drawings will be delivered to Engineer for directly or indirectly, in whole or in part, to <br /> Owner. the fault or negligence of Contractor or any <br /> Subcontractor,Supplier,or other individual or <br /> 6.13 Safety and Protection entity directly or indirectly employed by any <br /> of them). <br /> A. Contractor shall be solely responsible for <br /> initiating, maintaining and supervising all <br /> Standard General Conditions <br /> 00 72 00-23 <br />