Laserfiche WebLink
D. Contractor's duties and responsibilities for 1. Shop Drawings <br /> safety and for protection of the Work shall <br /> continue until such time as all the Work is a. Submit number of copies specified <br /> completed and Engineer has issued a notice to in the General Requirements. <br /> Owner and Contractor in accordance with <br /> Paragraph 14.07.13 that the Work is b. Data shown on the Shop Drawings <br /> acceptable (except as otherwise expressly will be complete with respect to <br /> provided in connection with Substantial quantities, dimensions, specified <br /> Completion). performance and design criteria, <br /> materials, and similar data to show <br /> 6.14 Safety Representative Engineer the services,materials,and <br /> equipment Contractor proposes to <br /> A. Contractor shall designate a qualified and provide and to enable Engineer to <br /> experienced safety representative at the Site review the information for the <br /> whose duties and responsibilities shall be the limited purposes required by <br /> prevention of accidents and the maintaining Paragraph 6.17.D. <br /> and supervising of safety precautions and <br /> programs. 2. Samples: Contractor shall also submit <br /> Samples to Engineer for review and <br /> 6.15 Hazard Communication Programs approval in accordance with the <br /> acceptable schedule of Shop Drawings <br /> A. Contractor shall be responsible for and Sample submittals. <br /> coordinating any exchange of material safety <br /> data sheets or other hazard communication a. Submit number of Samples specified <br /> information required to be made available to in the Specifications. <br /> or exchanged between or among employers at <br /> the Site in accordance with Laws or b. Clearly identify each Sample as to <br /> Regulations. material, Supplier, pertinent data <br /> such as catalog numbers,the use for <br /> 6.16 Emergencies which intended and other data as <br /> Engineer may require to enable <br /> A. In emergencies affecting the safety or Engineer to review the submittal for <br /> protection of persons or the Work or property the limited purposes required by <br /> at the Site or adjacent thereto, Contractor is Paragraph 6.17.D. <br /> obligated to act to prevent threatened damage, <br /> injury, or loss. Contractor shall give Engineer B. Where a Shop Drawing or Sample is required <br /> prompt written notice if Contractor believes by the Contract Documents or the Schedule of <br /> that any significant changes in the Work or Submittals, any related Work performed prior <br /> variations from the Contract Documents have to Engineer's review and approval of the <br /> been caused thereby or are required as a result pertinent submittal will be at the sole expense <br /> thereof. If Engineer determines that a change and responsibility of Contractor. <br /> in the Contract Documents is required <br /> because of the action taken by Contractor in C. Submittal Procedures <br /> response to such an emergency, a Work <br /> Change Directive or Change Order will be 1. Before submitting each Shop Drawing or <br /> issued. Sample, Contractor shall have <br /> determined and verified: <br /> 6.17 Shop Drawings and Samples <br /> a. all field measurements, quantities, <br /> A. Contractor shall submit Shop Drawings and dimensions, specified performance <br /> Samples to Engineer for review and approval and design criteria, installation <br /> in accordance with the acceptable Schedule of requirements, materials, catalog <br /> Submittals (as required by Paragraph 2.07). numbers, and similar information <br /> Each submittal will be identified as Engineer with respect thereto; <br /> may require. <br /> Standard General Conditions <br /> 00 72 00-24 <br />