My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
b. the suitability of all materials with 2. Engineer's review and approval will not <br /> respect to intended use, fabrication, extend to means, methods, techniques, <br /> shipping, handling, storage, sequences, or procedures of construction <br /> assembly, and installation pertaining (except where a particular means, <br /> to the performance of the Work; method, technique, sequence, or <br /> procedure of construction is specifically <br /> c. all information relative to and expressly called for by the Contract <br /> Contractor's responsibilities for Documents) or to safety precautions or <br /> means, methods, techniques, programs incident thereto. The review <br /> sequences, and procedures of and approval of a separate item as such <br /> construction, and safety precautions will not indicate approval of the assembly <br /> and programs incident thereto;and in which the item functions. <br /> d. shall also have reviewed and 3. Engineer's review and approval shall not <br /> coordinated each Shop Drawing or relieve Contractor from responsibility for <br /> Sample with other Shop Drawings any variation from the requirements of <br /> and Samples and with the the Contract Documents unless <br /> requirements of the Work and the Contractor has complied with the <br /> Contract Documents. requirements of Paragraph 6.17.C.3 and <br /> Engineer has given written approval of <br /> 2. Each submittal shall bear a stamp or each such variation by specific written <br /> specific written certification that notation thereof incorporated in or <br /> Contractor has satisfied Contractor's accompanying the Shop Drawing or <br /> obligations under the Contract Sample. Engineer's review and approval <br /> Documents with respect to Contractor's shall not relieve Contractor from <br /> review and approval of that submittal. responsibility for complying with the <br /> requirements of Paragraph 6.17.C.1. <br /> 3. With each submittal, Contractor shall <br /> give Engineer specific written notice of E. Resubmittal Procedures <br /> any variations, that the Shop Drawing or <br /> Sample may have from the requirements 1. Contractor shall make corrections <br /> of the Contract Documents. This notice required by Engineer and shall return the <br /> shall be both a written communication required number of corrected copies of <br /> separate from the Shop Drawing's or Shop Drawings and submit, as required, <br /> Sample Submittal; and, in addition, by a new Samples for review and approval. <br /> specific notation made on each Shop Contractor shall direct specific attention <br /> Drawing or Sample submitted to in writing to revisions other than the <br /> Engineer for review and approval of each corrections called for by Engineer on <br /> such variation. previous submittals. <br /> D. Engineer's Review 6.18 Continuing the Work <br /> 1. Engineer will provide timely review of A. Contractor shall carry on the Work and adhere <br /> Shop Drawings and Samples in to the Progress Schedule during all disputes or <br /> accordance with the Schedule of disagreements with Owner.No Work shall be <br /> Submittals acceptable to Engineer. delayed or postponed pending resolution of <br /> Engineer's review and approval will be any disputes or disagreements, except as <br /> only to determine if the items covered by permitted by Paragraph 15.04 or as Owner <br /> the submittals will, after installation or and Contractor may otherwise agree in <br /> incorporation in the Work, conform to writing. <br /> the information given in the Contract <br /> Documents and be compatible with the 6.19 Contractor's General Warranty and Guarantee <br /> design concept of the completed Project <br /> as a functioning whole as indicated by the A. Contractor warrants and guarantees to Owner <br /> Contract Documents. that all Work will be in accordance with the <br /> Standard General Conditions <br /> 00 72 00-25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.