My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
there are comparable provisions for the C. Contractor shall be liable to Owner and any <br /> benefit of Contractor in said direct contracts other contractor for the reasonable direct <br /> between Owner and such utility owners and delay and disruption costs incurred by such <br /> other contractors. other contractor as a result of Contractor's <br /> action or inactions. <br /> C. If the proper execution or results of any part <br /> of Contractor's Work depends upon work ARTICLE 8—OWNER'S RESPONSIBILITIES <br /> performed by others under this Article 7, <br /> Contractor shall inspect such other work and 8.01 Communications to Contractor <br /> promptly report to Engineer in writing any <br /> delays, defects, or deficiencies in such other A. Except as otherwise provided in these General <br /> work that render it unavailable or unsuitable Conditions, Owner shall issue all <br /> for the proper execution and results of communications to Contractor through <br /> Contractor's Work. Contractor's failure to so Engineer. <br /> report will constitute an acceptance of such <br /> other work as fit and proper for integration 8.02 Replacement of Engineer <br /> with Contractor's Work except for latent <br /> defects and deficiencies in such other work. A. In case of termination of the employment of <br /> Engineer, Owner shall appoint an engineer to <br /> 7.02 Coordination whom Contractor makes no reasonable <br /> objection, whose status under the Contract <br /> A. If Owner intends to contract with others for Documents shall be that of the former <br /> the performance of other work on the Project Engineer. <br /> at the Site, the following will be set forth in <br /> Supplementary Conditions: 8.03 Furnish Data <br /> 1. the individual or entity who will have A. Owner shall promptly fiunish the data <br /> authority and responsibility for required of Owner under the Contract <br /> coordination of the activities among the Documents. <br /> various contractors will be identified; <br /> 8.04 Pay When Due <br /> 2. the specific matters to be covered by such <br /> authority and responsibility will be A. Owner shall make payments to Contractor <br /> itemized;and when they are due as provided in Paragraphs <br /> 14.02.0 and 14.07.C. <br /> 3. the extent of such authority and <br /> responsibilities will be provided. 8.05 Lands and Easements;Reports and Tests <br /> B. Unless otherwise provided in the A. Owner's duties in respect of providing lands <br /> Supplementary Conditions, Owner shall have and easements and providing engineering <br /> sole authority and responsibility for such surveys to establish reference points are set <br /> coordination. forth in Paragraphs 4.01 and 4.05. Paragraph <br /> 4.02 refers to Owner's identifying and making <br /> 7.03 Legal Relationships available to Contractor copies of reports of <br /> explorations and tests of subsurface <br /> A. Paragraphs 7.0 LA and 7.02 are not applicable conditions and drawings of physical <br /> for utilities not under the control of Owner. conditions in or relating to existing surface or <br /> subsurface structures at or contiguous to the <br /> B. Each other direct contract of Owner under Site that have been utilized by Engineer in <br /> Paragraph 7.01.A shall provide that the other preparing the Contract Documents. <br /> contractor is liable to Owner and Contractor <br /> for the reasonable direct delay and disruption <br /> costs incurred by Contractor as a result of the <br /> other contractor's actions or inactions. <br /> Standard General Conditions <br /> 00 72 00-28 <br />
The URL can be used to link to this page
Your browser does not support the video tag.