Laserfiche WebLink
will be as provided in Paragraph 9.09. If and design drawings submitted in response to <br /> Owner designates another representative or a delegation of professional design services,if <br /> agent to represent Owner at the Site who is any,see Paragraph 6.21. <br /> not Engineer's consultant, agent or employee, <br /> the responsibilities and authority and C. In connection with Engineer's authority as to <br /> limitations thereon of such other individual or Change Orders,see Articles 10, 11,and 12. <br /> entity will be as provided in the <br /> Supplementary Conditions. D. In connection with Engineer's authority as to <br /> Applications for Payment,see Article 14. <br /> 9.04 Authorized Variations in Work <br /> 9.07 Determinations for Unit Price Work <br /> A. Engineer may authorize minor variations in <br /> the Work from the requirements of the A. Engineer will determine the actual quantities <br /> Contract Documents which do not involve an and classifications of Unit Price Work <br /> adjustment in the Contract Price or the performed by Contractor. Engineer will <br /> Contract Times and are compatible with the review with Contractor the Engineer's <br /> design concept of the completed Project as a preliminary determinations on such matters <br /> functioning whole as indicated by the before rendering a written decision thereon <br /> Contract Documents. These may be (by recommendation of an Application for <br /> accomplished by a Field Order and will be Payment or otherwise). Engineer's written <br /> binding on Owner and also on Contractor, decision thereon will be final and binding <br /> who shall perform the Work involved (except as modified by Engineer to reflect <br /> promptly. If Owner or Contractor believes changed factual conditions or more accurate <br /> that a Field Order justifies an adjustment in data) upon Owner and Contractor, subject to <br /> the Contract Price or Contract Times,or both, the provisions of Paragraph 10.05. <br /> and the parties are unable to agree on <br /> entitlement to or on the amount or extent, if 9.08 Decisions on Requirements of Contract <br /> any, of any such adjustment, a Claim may be Documents and Acceptability of Work <br /> made therefor as provided in Paragraph <br /> 10.05. A. Engineer will be the initial interpreter of the <br /> requirements of the Contract Documents and <br /> 9.05 Rejecting Defective Work judge of the acceptability of the Work <br /> thereunder. All matters in question and other <br /> A. Engineer will have authority to reject Work matters between Owner and Contractor <br /> which Engineer believes to be defective, or arising prior to the date final payment is due <br /> that Engineer believes will not produce a relating to the acceptability of the Work, and <br /> completed Project that conforms to the the interpretation of the requirements of the <br /> Contract Documents or that will prejudice the Contract Documents pertaining to the <br /> integrity of the design concept of the performance of the Work, will be referred <br /> completed Project as a functioning whole as initially to Engineer in writing within 30 days <br /> indicated by the Contract Documents. of the event giving rise to the question <br /> Engineer will also have authority to require <br /> special inspection or testing of the Work as B. Engineer will, with reasonable promptness, <br /> provided in Paragraph 13.04, whether or not render a written decision on the issue referred. <br /> the Work is fabricated, installed, or If Owner or Contractor believe that any such <br /> completed. decision entitles them to an adjustment in the <br /> Contract Price or Contract Times or both, a <br /> 9.06 Shop Drawings, Change Orders and Payments Claim may be made under Paragraph 10.05. <br /> The date of Engineer's decision shall be the <br /> A. In connection with Engineer's authority, and date of the event giving rise to the issues <br /> limitations thereof, as to Shop Drawings and referenced for the purposes of Paragraph <br /> Samples,see Paragraph 6.17. 10.05.13. <br /> B. In connection with Engineer's authority, and C. Engineer's written decision on the issue <br /> limitations thereof, as to design calculations referred will be final and binding on Owner <br /> Standard General Conditions <br /> 00 72 00-30 <br />