Laserfiche WebLink
and Contractor, subject to the provisions of approvals that the results certified indicate <br /> Paragraph 10.05. compliance with the Contract Documents. <br /> D. When functioning as interpreter and judge E. The limitations upon authority and <br /> under this Paragraph 9.08, Engineer will not responsibility set forth in this Paragraph 9.09 <br /> show partiality to Owner or Contractor and shall also apply to, the Resident Project <br /> will not be liable in connection with any Representative,if any,and assistants,if any. <br /> interpretation or decision rendered in good <br /> faith in such capacity. ARTICLE 10—CHANGES IN THE WORK;CLAIMS <br /> 9.09 Limitations on Engineer's Authority and 10.01 Authorized Changes in the Work <br /> Responsibilities <br /> A. Without invalidating the Contract and without <br /> A. Neither Engineer's authority or responsibility notice to any surety, Owner may, at any time <br /> under this Article 9 or under any other or from time to time, order additions, <br /> provision of the Contract Documents nor any deletions, or revisions in the Work by a <br /> decision made by Engineer in good faith Change Order, or a Work Change Directive. <br /> either to exercise or not exercise such Upon receipt of any such document, <br /> authority or responsibility or the undertaking, Contractor shall promptly proceed with the <br /> exercise, or performance of any authority or Work involved which will be performed <br /> responsibility by Engineer shall create, under the applicable conditions of the <br /> impose, or give rise to any duty in contract, Contract Documents (except as otherwise <br /> tort, or otherwise owed by Engineer to specifically provided). <br /> Contractor, any Subcontractor, any Supplier, <br /> any other individual or entity,or to any surety B. If Owner and Contractor are unable to agree <br /> for or employee or agent of any of them. on entitlement to, or on the amount or extent, <br /> if any, of an adjustment in the Contract Price <br /> B. Engineer will not supervise,direct,control,or or Contract Times, or both, that should be <br /> have authority over or be responsible for allowed as a result of a Work Change <br /> Contractor's means, methods, techniques, Directive, a Claim may be made therefor as <br /> sequences, or procedures of construction, or provided in Paragraph 10.05. <br /> the safety precautions and programs incident <br /> thereto, or for any failure of Contractor to 10.02 Unauthorized Changes in the Work <br /> comply with Laws and Regulations applicable <br /> to the performance of the Work.Engineer will A. Contractor shall not be entitled to an increase <br /> not be responsible for Contractor's failure to in the Contract Price or an extension of the <br /> perform the Work in accordance with the Contract Times with respect to any work <br /> Contract Documents. performed that is not required by the Contract <br /> Documents as amended, modified, or <br /> C. Engineer will not be responsible for the acts supplemented as provided in Paragraph 3.04, <br /> or omissions of Contractor or of any except in the case of an emergency as <br /> Subcontractor, any Supplier, or of any other provided in Paragraph 6.16 or in the case of <br /> individual or entity performing any of the uncovering Work as provided in Paragraph <br /> Work. 13.04.13. <br /> D. Engineer's review of the final Application for 10.03 Execution of Change Orders <br /> Payment and accompanying documentation <br /> and all maintenance and operating A. Owner and Contractor shall execute <br /> instructions, schedules, guarantees, bonds, appropriate Change Orders recommended by <br /> certificates of inspection,tests and approvals, Engineer covering: <br /> and other documentation required to be <br /> delivered by Paragraph 14.07.A will only be 1. changes in the Work which are: (i) <br /> to determine generally that their content ordered by Owner pursuant to Paragraph <br /> complies with the requirements of, and in the 10.0l.A, (ii) required because of <br /> case of certificates of inspections, tests, and acceptance of defective Work under <br /> Standard General Conditions <br /> 00 72 00-31 <br />