My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 08/23/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 08/23/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:52:06 PM
Creation date
8/22/2016 11:21:21 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
08/23/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
434
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
no. <br /> Our Mission: To work"ettrer to resposibty grow our community,and to provide quality,cost-effective.and efficient government services. <br /> CC Regular Session 7.3. <br /> Meeting Date: 08/23/2016 <br /> By: Bruce Westby,Engineering/Public <br /> Works <br /> Information <br /> Title: <br /> Adopt Resolution 916-08-144 Accepting Bids and Awarding Contract for Improvement Project 916-95,Zeolite <br /> Street Storm Sewer Extension <br /> Purpose/Background: <br /> Purpose: <br /> The purpose of this case is to consider adopting Resolution#16-08-144 accepting bids and awarding a contract for <br /> construction for Improvement Project 416-95,Zeolite Street Storm Sewer Extension. <br /> Background: <br /> During the development of Ramsey Town Center 8th Addition in 2006,the trunk storm sewer system along the <br /> west side of Zeolite Street from 147th Lane to the south side of Bunker Lake Boulevard was installed. This trunk <br /> storm sewer system was designed to convey storm water drainage from Ramsey Town Center 8th, 9th, and 10th <br /> Additions,as well as additional areas to the north,to"Lake Ramsey"cast of Zeolite Street and south of Bunker <br /> Lake Boulevard. The last few hundred feet of this trunk line under Bunker Lake Boulevard and into Lake Ramsey <br /> was proposed to be constructed with 73"Arch Reinforced Concrete Pipe (A-RCP) storm sewer. Attached is a plan <br /> sheet from RTC 8th Addition showing a portion of the proposed 73"A-RCP storm sewer alignment and profile <br /> north of Bunker Lake Boulevard. However, this plan sheet does not show the entire portion of trunk storm sewer <br /> that was constructed in 2006 extending to the south side of Bunker Lake Boulevard. The City never received <br /> as-built record plans for RTC 8th Addition so this is the only plan sheet available. <br /> While the 73"A-RCP storm sewer was being constructed,questions arose as to whether the remaining <br /> unconstructed portion of the 73"A-RCP trunk storm sewer outlet to Lake Ramsey should be down-sized to reduce <br /> construction costs. While options were being considered,the end of the storm sewer pipe was covered with a sheet <br /> of plywood and the pipe and plywood were backfilled. The housing market collapsed at this time so the outlet was <br /> not immediately needed. The pipe was then covered with a plywood sheet and was buried without completing the <br /> outlet. The plywood sheet eventually rotted and failed in 2012,at which time it was replaced with another sheet of <br /> plywood since the storm sewer was anticipated to be extended later that year,which then never occurred. <br /> The 73"A-RCP storm sewer line incorporates an outlet pipe from the undeveloped triangular parcel in the <br /> northwest corner of the intersection of Bunker Lake Boulevard and Zeolite Street,more commonly known as COR <br /> Three North Commons. After the 73"A-RCP storm sewer line fills with a little over a foot of stormwater runoff,the <br /> excess stormwater flows back out of the COR Three North Commons outlet pipe where it is then stored in a low <br /> area until it infiltrates into the ground. The 73"A-RCP storm sewer pipe therefore typically has a foot or more of <br /> standing water in it,meaning the sheet of plywood blocking the end is continually wet which makes it even more <br /> prone to rotting. <br /> On June 16,2015, the Public Works Committee was asked to provide a recommendation to the City Council for <br />
The URL can be used to link to this page
Your browser does not support the video tag.