My WebLink
|
Help
|
About
|
Sign Out
Home
10/08/87 Special
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Board of Adjustment
>
Agendas
>
1980's
>
1987
>
10/08/87 Special
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/22/2025 1:33:11 PM
Creation date
6/18/2004 11:22:19 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Board of Adjustment - Special
Document Date
10/08/1987
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ANOKA COUNTY SOIL AND WATER <br /> CONSERVATION DISTRICT <br /> <br />MINNESOTA <br />SOIL AND WATER CONSERVATION DISTRICTS <br /> sg~te'mber 16, 1987 <br /> <br />Pioneer Villoge Center <br /> <br />12553 Central Ave. N.E. <br /> <br />Telephone (612) 757-422J <br /> <br />TO: <br /> <br />FROM: <br /> <br />Regency Homes <br />3825 - 85th. Ave. No. <br />Brooklyn Park, }~.'55443 <br />Attn: b~rshall Pearson ' <br /> <br /> Anoka SWCD Board of Supervisors, Alan L. Vokaty, Chairman <br />.Patricia L. Rudolph, District Technical Administrator <br /> Joel W. Esteb, District Technician. ' <br /> <br /> Erosion and sediment control recommendation for 15855 Juniper Ridge Drive <br /> Ramsey, <br /> <br /> Upon your request and that of John Stine, DNR Area Hydrologist, our staff <br />made an initial site evaluation on September 15, 1987 and has developed the following <br />erosion and sediment control recommendations. If you have any question about imple- <br />mentation please call our office. I have coordinated the following plan with John <br />Stine, he also will have additional recommendations within his variance.permit. <br /> <br />River Bank Erosion Area <br /> <br />A. Deposition in river (approximately 30' x 35' in size) <br /> 1.) Removal; (please see DNR variance certification specs on method and <br /> amounts). <br /> 2.) Spoil removed should be used to fill in lower river bank eroded <br /> area. This material should be adequately compacted to avoid sloughing. <br />B. Upon receipt of 'building permit from City'of Ramsey a stairway may be <br /> constructed from top of river bank to bottom of bank. This will facili- <br /> tate the construction process as well as provide a stable walk area and <br /> eliminate unnecessary foot traffic which would result in further bank <br /> erosion. <br />C. The entire eroded gully areas of the bank should be filled from bottom <br /> up (with spoi~ from river) and filled in by pushing fill over top of <br /> bank. Area of fill should be sufficiently compacted. <br />D. Four inches of topsoil should be applied in two stages over entire filled <br /> area. First stage: 2" spread and incorporated into existing sand soil. <br /> Second stage: 2" of top soil spread. Sufficient fertilizer should be <br /> lightly raked in. <br />E. Entire disturbed area can be revegetated by either sodding.and staking <br /> in (several stakes on each roll should be used to sufficiently hold <br /> rolls in place) or by seeding, mulching, ne>ting and staking; see appendix <br /> A for specs. <br /> <br />AN EQUAL OPPORTUNITY EMPLOYER <br /> ,~155C <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.