|
PAY ESTIMATE #4
<br />CITY OF RAMSEY
<br />1415T AVE. NW, AZURiTE ST. NW AND BASALT AVE. NW
<br />IMPROVEMENT PRQJECT 03-2.7
<br />
<br />CHANGE ORDER NO. 1
<br />
<br /> Contract
<br /> Item Description Contract Unit Price Amount Used tq Date Extension
<br />
<br /> Salvage and Reinstall Aggregate Surfacing 150ICY $3.25 CY $487.50 150, $ 487.50
<br /> 2 Connect to E. xisting Sanitary Server I LS $3,000.00 LS 53,000.00 11 $ 3,000.00
<br /> 3 8" PVC (SDR 35) 0-8' dept.h 250 LF $12.25 LF $3,062.50 25(] $ 3,062.50
<br /> 4,48" Diameter Manhole, Frame and Cas!lng (0-8' depth) 1.00EA $1,625.00 EA $1,625.00 lI $ 1,625.00
<br /> 5 8" x 6" Service Wves (SDR-26) 3 EA $47.00 EA $141.00 41 $ 188.00
<br /> .... 205
<br /> 616" PVC (SD~ 26) Service Pipe and Riser 105 FT . . 512.25 FT $1,286,25 $ 2,511.25
<br /> 7i6" PVC Cap . 3 EA $2.80 EA $8.40 4 $ 11.20
<br /> 9 Televise Sanitary Sewer Lines 250 LF $0.50 LF ,~125.00
<br /> Connect to Existing Watermain 1 L$ $450.00 LS $450:00 l $ 450.00
<br />l 0 6" DIP Watermain (Class 52) I10LF $16,25 LF $1,787,50 110 $ 1,787,50
<br />
<br /> 1 8" DIP Watermain (Class 52) 300 LF $20.50 LF $6,150.00 300 $ 6,150.00
<br />12!l-Iydrant . . I EA $1,750.00 EA $l,750.00' I $ 1,750.00
<br />13 6" Gate Valves and Box 3 EA 5415.00 EA $1,245.00 4 $ 1,660.00
<br />
<br />14:F.i. ttings 515 LBS $1.35 LBS $695.25 715 $ 965.25
<br />
<br />15 Seeding, Fertilizer and Mulch 0.2 AC $1,600.00:AC $.320.00 0.2 $ 320.00
<br />
<br />$22,133.40 $ 23,968.20
<br />
<br />Summary uf Bidding
<br />
<br />Bid Schedule "A" - SANITARY SEWER
<br />
<br />Bid Schedule "B" - WATERMAIN
<br />
<br />Bid Schedule "C" - STORM SEWER
<br />
<br />Bid Schedule "D" -STREETS AND RESTORATION
<br />
<br />Change Order No. 1
<br />
<br />Total Bid Amount
<br />
<br />Total Work Complete To-Date:
<br />*Includes Field Change
<br />
<br />$ 46,519.10
<br />
<br />$ 60.032.50 *
<br />
<br />90,596.50 *
<br />
<br />168,211.00 *
<br />
<br />$22,133,40
<br />
<br />$ 387,492.50 *
<br />
<br />44,265.90
<br />52,600.00
<br />91,184.00
<br />126,999.61
<br />23,968.20
<br />
<br />339,017.71
<br />
<br />339,017.71
<br />16,950.89
<br />155,872.11
<br />55,191.68
<br />56,444.35
<br />54,558.69
<br />
<br />Total
<br />Leas 5% Retainage
<br />Less Pay Estimate No. !
<br />Less Pay Estimate No. 2
<br />Less Pay Estimate No. 3
<br />We Reeummend Payment of:
<br />
<br />*FIELD CIJa[N G E
<br />
<br />-89-
<br />
<br />
<br />
|