Laserfiche WebLink
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 15-STM-004 <br /> Project Name Alpine Drive Reconstruction <br /> Type Improvement Department Stormwater Utility <br /> Useful Life 50 Years Contact <br /> Category Storm Water Utility Improveme Priority 1-Existing Obligation(High) <br /> Status Active <br /> Description Total Project Cost: $82,000 <br /> Reconstruction of Alpine Drive from Armstrong Boulevard to Variolite Street <br /> Total Project Cost=$793,600 <br /> Street Improvement: $711,600 <br /> Storm Water Improvement: $ 82,000 <br /> Justification <br /> These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br /> applied. This project will install concrete curb and gutter and storm sewer. <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 82,000 82,000 <br /> Building Cost <br /> Total 82,000 82,000 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> Storm Water Utility Fund 82,000 82,000 <br /> Total 82,000 82,000 <br /> 116 <br />