My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/17/2016
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2016
>
Agenda - Parks and Recreation Commission - 08/17/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:50:22 PM
Creation date
8/30/2016 12:20:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 15-STM-004 <br /> Project Name Alpine Drive Reconstruction <br /> Type Improvement Department Stormwater Utility <br /> Useful Life 50 Years Contact <br /> Category Storm Water Utility Improveme Priority 1-Existing Obligation(High) <br /> Status Active <br /> Description Total Project Cost: $82,000 <br /> Reconstruction of Alpine Drive from Armstrong Boulevard to Variolite Street <br /> Total Project Cost=$793,600 <br /> Street Improvement: $711,600 <br /> Storm Water Improvement: $ 82,000 <br /> Justification <br /> These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br /> applied. This project will install concrete curb and gutter and storm sewer. <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 82,000 82,000 <br /> Building Cost <br /> Total 82,000 82,000 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> Storm Water Utility Fund 82,000 82,000 <br /> Total 82,000 82,000 <br /> 116 <br />
The URL can be used to link to this page
Your browser does not support the video tag.