Laserfiche WebLink
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 15-STM-005 <br /> Project Name Reconstruction Streets-Stanhope Terr& North Forty <br /> Type Improvement Department Stormwater Utility <br /> Useful Life 50 Years Contact <br /> Category Storm Water Utility Improveme Priority 3-Existing Obligation(Med) <br /> Status Active <br /> Description Total Project Cost: $398,200 <br /> Reconstruction of streets in Stanhope Terrace: Ute Street, 153rd Lane, 154th Lane <br /> North Forty: 163rd Lane,Alpaca st,Chameleon St. <br /> Total Project Cost=$ 1,750,000 <br /> Street Improvement: $1,351,800 <br /> Storm Water Improvments: $ 398,200 *** <br /> Justification <br /> These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br /> applied. This project will install concrete curb and gutter and storm sewer. <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 398,200 398,200 <br /> Building Cost <br /> Total 398,200 398,200 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> Storm Water Utility Fund 398,200 398,200 <br /> Total 398,200 398,200 <br /> 117 <br />