My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/17/2016
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2016
>
Agenda - Parks and Recreation Commission - 08/17/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:50:22 PM
Creation date
8/30/2016 12:20:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 12-STR-008 <br /> Project Name Reconstruct Riverdale Drive to Tungston Street <br /> Type Improvement Department Street Improvements <br /> Useful Life 60 Years Contact <br /> Category Street Improvement Priority 3-Existing Obligation(Med) <br /> Status Active <br /> Description Total Project Cost: $1,350,000 <br /> This project would reconstruct Riverdale Drive to Tungston Street <br /> Justification <br /> This project will reconstruct Riverdale Drive,grading the shoulder for a 10 foot bituminous trail which is part of the Mississippi River Trail grant <br /> from the National Park Service.This project as scoped removes all bituminous and curb.Storm sewer will be installed to meet MSA spacing <br /> guidelines.The curb will be replaced and new bituminous will be installed.This is an MSA route. <br /> The roadway is scoped at two 12 foot driving lanes and two eight foot parking lanes.There could be cost savings through retaining the curb on <br /> one side of the road,installed one 8 foot parking lane and replacing curb. <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 1,350,000 1,350,000 <br /> Building Cost <br /> Total 1,350,000 1,350,000 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> Public Improvement Revolving 1,350,000 1,350,000 <br /> Fund <br /> Total 1,350,000 1,350,000 <br /> 125 <br />
The URL can be used to link to this page
Your browser does not support the video tag.