Laserfiche WebLink
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 15-STR-001 <br /> Project Name Riverdale Drive Extension: Traprock to Ramsey Blvd <br /> Type Improvement Department Street Improvements <br /> Useful Life 60 Years Contact <br /> Category Street Improvement Priority 2-New Addition(High) <br /> Status Active <br /> Description Total Project Cost: $1,253,280 <br /> This project would extend Riverdale Drive from Traprock to Armstrong Boulevard <br /> Justification <br /> The City was awarded a grant from MN/DOT for partial construction of this segment of street in an amount not to exceed$584,280. The <br /> Armstrong Boulevard overpass will require the extension of Riverdale Drive to provide local access. This project includes installation of water <br /> with construction of the street. The utility costs are itemized on separate projects. <br /> Total Project Costs: $1,253,280(not including street lights) <br /> Watermain Extension(04-WTR-018) $ 185,000 <br /> Stormwater(16-STM-003) $ 103,050 <br /> Street Improvement(12-STR-007) $ 965,230 <br /> *Street Lighting(16-STLT-001) $ 275,000(related project not included in costs) <br /> Total Project Cost $ 1,253,280 <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 1,000,000 253,280 1,253,280 <br /> Building Cost <br /> Total 1,000,000 253,280 1,253,280 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> Grants/Outside Sources 331,000 253,280 584,280 <br /> MSA 669,000 669,000 <br /> Total 1,000,000 253,280 1,253,280 <br /> 126 <br />