My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 08/17/2016
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2016
>
Agenda - Parks and Recreation Commission - 08/17/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:50:22 PM
Creation date
8/30/2016 12:20:00 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
08/17/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
195
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 15-STR-002 <br /> Project Name Andrie Street/164th Lane Reconstruction <br /> Type Improvement Department Street Improvements <br /> Useful Life 60 Years Contact <br /> Category Street Improvement Priority 1-Existing Obligation(High) <br /> Status Active <br /> Description Total Project Cost: $2,378,000 <br /> Includes reconstruction of Andrie Street and 164th Lane between Alpine Drive and Jarvis Street,including an 8-foot parking lane on one side <br /> only. Widening of road by two-feet is non-bond eligible.. <br /> Total Project Cost=$2,905,000 <br /> Street Improvement: $2,378,000 ($35,000 for 2-ft road widening) <br /> Storm Improvement: $527,000 <br /> 65 properties eligible for special assessments <br /> Justification <br /> These streets are in poor condition and require reconstruction. The pavement has deteriorated beyond the point where an overlay could be <br /> applied. This project will install concrete curb and gutter and an on-street bike lane. Storm sewer will be added where necessary to protect the <br /> pavement. The current roadway has standing water during certain seasons which weakens the pavement. <br /> 25%Assessment <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 2,378,000 2,378,000 <br /> Building Cost <br /> Total 2,378,000 2,378,000 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> GO Bonding(Road Funding) 1,748,500 1,748,500 <br /> Public Improvement Revolving 35,000 35,000 <br /> Fund <br /> Special Assessment-Bonded 594,500 594,500 <br /> Total 2,378,000 2,378,000 <br /> 127 <br />
The URL can be used to link to this page
Your browser does not support the video tag.