Laserfiche WebLink
Capital Improvement Program 2016 thru 2020 <br /> City of Ramsey, Minnesota <br /> Project# 16-STR-005 <br /> Project Name Sunwood Drive Striping Improvments <br /> Type Improvement Department Street Improvements <br /> Useful Life 10 Contact <br /> Category Street Improvement Priority 1-Existing Obligation(High) <br /> Status Active <br /> Description Total Project Cost: $30,000 <br /> Remove and replace pavement striping along Sunwood Drive between Ramsey Boulevard <br /> and the beginning of the realigned segment of Sunwood Drive,south of the roundabout. <br /> Justification <br /> The existing pavement striping along Sunwood Drive is wearing out and needs to be replaced. In addition,the center turn lane for the Residence <br /> at The COR's west driveway needs to be modified to provide a westbound protected left turn lane into the driveway. The existing striping <br /> provides a protected left turn for eastbound traffic into a curb cut for a non-existing north-south street north of the Residence. Staff will also <br /> evaluate potential striping modifications for the left turn lane west of Ramsey Boulevard at the locatin of the new driveway for Casey's gas station <br /> and convenience store. <br /> Expenditures 2016 2017 2018 2019 2020 Total <br /> Improvements Other than 30,000 30,000 <br /> Building Cost <br /> Total 30,000 30,000 <br /> Funding Sources 2016 2017 2018 2019 2020 Total <br /> Public Improvement Revolving 30,000 30,000 <br /> Fund <br /> Total 30,000 30,000 <br /> 140 <br />