Laserfiche WebLink
Brian Pankratz, Vice President of Land Services with CBRE stated that from a traffic standpoint, <br />the location may not be ideal but this would fit into where development has started. He agreed <br />that Peridot would eventually have to be developed but noted that at some point in the future a <br />larger building will go in that area to support that construction. He stated that this additional <br />medical use would help to create a medical campus in that location because those uses tend to <br />group together. He referenced the alternative 1.69-acre site and noted that site would leave a lot <br />of open space around the lot because the building would not require that much land. <br />Community Development Director Gladhill stated that planning does support this use and <br />believes that it would fit into the OGA proposed one -acre site south of Casey's, noting that he <br />simply wanted the EDA to understand the complications with traffic and flow. <br />Member Williams stated that she finds the OGA one -acre proposal to be most appealing as she <br />would not support uneconomical remnants of parcels, especially along Sunwood Drive <br />(compared to the alternative 1.69 acre site). She did not want to see pieces of properties that <br />cannot be developed as development occurs in The COR. <br />Member LeTourneau asked the viability of a .69-acre parcel, as this user would only require one <br />acre and that would be the leftover portion of the 1.69 acre alternative discussed by the Planning <br />Department. <br />Mr. Pankratz stated that to build a building of that size that would fit on the remnant .69 acre <br />parcel, would have a very high cost. He noted that usually a smaller user will go into a multi - <br />tenant building to save on those building costs. <br />Chairperson Steffen asked and received confirmation that the three acres behind the parcels <br />would still be available for development and this would not impair the ability to develop that <br />land. <br />Chairperson Steffen verified the consensus of the EDA to work with OGA on their desired one - <br />acre site located south of Casey's. <br />Economic Dev. Mgr/Assistant City Administrator Brama stated that the terms and conditions <br />were discussed in closed session and consensus was reached on the location. He noted that this <br />item will move forward to the Planning Commission tonight and the City Council on Monday. <br />4.02: 2017 EDA Workplan <br />Economic Dev. Mgr/Assistant City Administrator Brama presented the staff report. He <br />highlighted major changes to items seven and four. <br />Chairperson Steffen stated that this is very well done and thorough. He asked for clarification on <br />item three on the change log document as two consulting firms are referenced. <br />Economic Dev. Mgr/Assistant City Administrator Brama stated that is an error, noting that the <br />City is using Hakanson Anderson to manage and administer the process. He provided an update. <br />Economic Development Authority/August 4, 2016 <br />Page 3 of 6 <br />