Laserfiche WebLink
What do you want in your back yard? <br /> The following smaller geographic areas need to be addressed as part of the overall Land Use Plan: <br /> • Mississippi River Corridor Critical Area(MRCCA) <br /> • Closed Landfill Land Use Plan <br /> • South of Highway 10 <br /> • Highway 10 Access Planning Study Impacted Parcels <br /> Review of End Product: <br /> • Economic Development Authority <br /> • Environmental Policy Board <br /> • Parks and Recreation Commission <br /> • Planning Commission <br /> • City Council <br /> NOTE: Element#3 should be completed before Elements #4 through#8. <br /> Elements #4 through#8 can run concurrently if desired,with specific workinggroWs with expertise and <br /> desire in specific topical categories. <br /> Element#4:TRANSPORTATION PLAN [Required Elementl <br /> Desired Outcome:Review and Amend/Update the Transportation Chapter of the Comprehensive <br /> Plan. <br /> What transportation infrastructure is necessary for Ramsey <br /> At minimum, the following factors need to be acknowledged in the 2040 Comprehensive Plan <br /> Update: <br /> 1. Armstrong Boulevard Interchange Design <br /> 2. US Highway 10 Access Planning Study <br /> Review of End Product: <br /> 1. Economic Development Authority <br /> 2. Planning Commission <br /> 3. Public Works Committee <br /> 4. City Council <br /> The City will consider inviting a representative from the Metropolitan Council Transportation <br /> Services Division and MnDOT to review the end product.As this is identified as one of the two (2) <br /> key regional policy issues for the community, the City will also invite our Metropolitan Council <br /> Member and Sector Representative for this element. <br /> This item is connected to the City's Legislative Platform. <br />