Laserfiche WebLink
3) That Ramsey Center will grant a temporary <br />construction easement, when necessary, to Ramsey <br />for street and utility eonstruct~o~ purposes over <br />and across a strip of land 50 feet wide, said strip <br />of land to be located adjacent, on both sides of <br />all land granted for permanent easement purposes <br />described in paragraph #2 above. <br /> <br />4) That Ramsey will waive its Parks and Open Space <br />dedication requirements of Chapter 170.03 of the <br />Ramsey City Code and any subsequent additions and <br />amendments thereto, as said requirements apply to <br />all of that real property described in paragraph I <br />above. <br /> <br />5) That Ramsey will waive up to 25% the lot size <br />and setback requirements for commercial uses of that <br />part of Ramsey Center's real property described as <br />follows: <br /> <br /> That part of Government Lot 3, Section 36, <br /> Township 32, Range 25 lying East of State <br /> Trunk Highway No. 47, together with <br /> That part of Government Lot 6, Section 36, <br /> Township 32, Range 25 lying East of State <br /> Trunk Highway No. 47; <br /> EXCEPT the property heretofore conveyed <br /> to Ramsey. <br /> <br />As an example if the minimum lot size for a commercial <br />use in the area is one acre, Ramsey will grant a variance <br />permitting the lot size to be a minimum of 75% of an acre, <br />or if the m~nimum setback requirement is 40 feet, Ramsey <br />will grant a variance permitting the setback to be a <br />minimum of 30 feet. <br /> <br /> <br />