Laserfiche WebLink
BiD <br />Improvement Project 84-18 and 84-19 <br /> Street Construction <br /> River's Bend & 149~h Avenue <br /> December, 1984 <br /> <br />FOREST LAKE CONTRACTING <br /> <br />Bid Schedule "A" - River'Bend Streets (Project 84-18) <br /> <br />Item <br /> <br />Estimated Quantity Unit Price <br /> <br />Extension <br /> <br />1. Subgrade Preparation 94.5 <br />2. Class 5 Aggregate 6,300 <br />3. Bituminous Surface (2341) 3,450 <br />4. Bituminous Material for <br /> Mix (2341) 207 <br />5. Concrete Curb & Gutter, <br /> Surmountable <br />6. Adjust Castings & <br /> Valve Boxes <br />7. Concrete Valley Gutters <br />8. Concrete Triangular <br /> Valley Gutter Section 6 <br />9. Seeding 6 <br />10. Mulch Type I 12 <br />11. Commercial Fertilizer 1.2 <br /> <br />19,300 <br /> <br />Road Stations $149.00 <br />Ton $4.90 <br />Ton $10.35 <br /> <br />Ton $200.00 <br /> <br />Linear Feet $4.23 /LF <br /> <br />Total Bid Schedule "A" - <br /> <br />75 Each $80.00 <br />81 Linear Feet $9.50 <br /> <br />Each $395.00 <br />Acres $145.00 <br />TOn $130.00 <br />TOn $300.00 <br /> <br />Unit Price <br /> <br />Bid Schedule "B" - 142nd Avenue & Turn Lanes <br /> <br />Item Estimated Quantity <br /> <br />/EA <br /> <br /> /EA <br />/AC <br />/T <br /> /T' <br /> <br />$14,080.50 <br />$30,870.00 <br />$35,707.50 <br /> <br />$41,400.00 <br /> <br />$81,639.00 <br /> <br />$6,000.00 <br /> $769.50 <br /> <br />$2,370.00 <br />$870.00 <br />$1,560.00 <br />$360.00 <br /> <br />$215,626.50 <br /> <br />Extension <br /> <br /> 1. Common Excavation 1,200 Cubic Yards $3. <br /> 2. Clearing 20 Trees $70. <br /> 3. Grubbing 20 Trees $30. <br /> 4. Subgrade Preparation 7 Road Stations $133. <br /> 5. Class V Aggregate 1,200 TOn $4. <br /> 6. Bituminous Surface (2331) 550 TOn $11. <br /> 7. Bituminous Surface (2341) 500 TOn $11. <br /> 8. Bituminous Material for <br /> Mix (2331) 25 Ton $200. <br />9. Bituminous Material for <br /> Mix (2341) 30 Ton $200. <br />10. Bituminous Tack Coat 250 Gallons $1. <br />11. Concrete Curb & Gutter <br /> (8618) 1,300 Linear Feet $5. <br />12. Edge of Travel Lane <br /> Marking 2,200 Linear Feet $0. <br />13. 18" CMP 56 Linear Feet $18. <br />14. 18" C~4P Flared End <br /> Section 2 Each $70. <br />15. Sodding 500 Square Yards $1. <br />16. Roadside Seeding 1.3 Acre $145. <br />17. Mulch Type I 2.6 Ton $130. <br />18. Commercial Fertilizer 0.3 TOn $300. <br />19. Adjust Castings & <br /> Valve Boxes 3 Each $80. <br /> <br />00 /CY <br />00 /TR <br />00 /TR <br />00 /RS <br />90 /T <br />25 /T <br />50 /T <br /> <br />oo/ <br /> <br />00 /T <br />l0 /GAL <br /> <br />10 /LF <br /> <br />10 /LF <br />00 /nE <br /> <br />00 /EA <br />25 /SY <br />00 /AC <br />00 /T <br />00 /T <br /> <br />oo /EA <br /> <br />$3,600.00 <br />$1,400.00 <br />$600.00 <br />$931.00 <br />$5,880.00 <br />$6,187.50 <br />$5,750.00 <br /> <br />$5,000.00 <br /> <br />$6,000.00 <br /> $275.00 <br /> <br />$6,630.00 <br /> <br /> $220.00 <br />$1,008.00 <br /> <br />$140.00 <br />$625.00 <br />$188.50 <br />$338.00 <br /> $90.00 <br /> <br />$240.00 <br /> <br />Total Bid Schedule "B" - $45,103.00 <br /> <br /> <br />