Laserfiche WebLink
Bid Schedule "C" - 149th Avenue N.W. & T.H. 47 Turn Lanes (S.A.P. 199-105-02) <br /> <br />Item Estimated Quantity Unit Price Extension <br /> <br /> 1. 2101.502 Clearing <br /> 2. 2101.507 Grubbing <br /> 3. 2105.501 Common <br /> Excavation <br /> 4. 2211.501 Class 5 <br /> Aggregate <br /> 5. 2331.508 Bituminous <br /> Material for Mixture <br /> 6. 2331.508 Bituminous <br /> Surface (2331) <br /> 7. 2341.504 Bituminous <br /> Material for Mixture <br /> 8. 2341.508 Bituminous <br /> Surface 2341 <br /> 9. 2357.502 Bituminous <br /> Tack Coat <br />10. 2503.511 18" RCP <br /> Class III <br />11. 2503.511 21" RCP <br /> Class III <br />12. 2056.508 Standard <br /> Manhole (48") <br />13. 2531.502 Concrete <br /> Curb & Gutter <br />14. 2575.501 Seeding <br />15. 2575.505 Sod <br />16. 2575.511 Mulch <br /> Material Type 1 <br />17. 2575.531 Common <br /> Fertilizer 20-10-10 <br />18. Spec. Break into <br /> Existing Manhole <br />19. Spec. Centerline Pave- <br /> ment Marking <br />20. Spec. Edge of Travel <br /> Lane Marking <br />21. Spec. Concrete Drive <br /> Apron <br /> <br />Total Bid Schedule "C" - <br /> <br /> 40 Trees <br /> 40 Trees <br /> <br />12,500 Cubic Yards <br /> <br /> 2,350 Ton <br /> <br /> 52 Ton <br /> <br /> 1,150 TOn <br /> <br /> 54 Ton <br /> <br /> 900 Ton <br /> <br /> 500 Gallon <br /> <br /> 44 Linear Feet <br /> 750 Linear Feet <br /> <br /> 3 Each <br /> <br /> 3,600 Linear Feet <br /> 2 Acre <br /> 1,200 Square Yard <br /> <br /> 2 Ton <br /> <br /> 0.4 TOn <br /> <br /> 1 Lump Sum <br /> 1,800 Linear Feet <br /> 6,000 Linear Feet <br /> <br /> 50 Linear Feet <br /> <br /> $65.00 /TR $2,600.00 <br /> $30.00 /TR $1,200.00 <br /> <br />$1.38 /CY $17,250.00 <br />$4.90 /T $11,515.00 <br />$200.00 /T $10,400.00 <br />$10.75 /T $12,362.50 <br />$200.00 /T $10,800.00 <br />$11.00 /T $9,900.00 <br />$1.10 /GAL $550.00 <br />$23.00 /LF $1,012.00 <br />$31.80 /LF $23,850.00 <br />$1,100.00 /FA $3,300.00 <br /> <br /> $4.54 /LF $16,344.00 <br /> $145.00 /AC $290.00 <br /> $1.25 /SY $1,500.00 <br /> <br /> $130.00 /T $260.00 <br /> $300.00 /T $120.00 <br /> $250.00 /LS $250.00 <br /> S0.10 /LF $180.00 <br /> $0.10 /LF $600.00 <br /> $10.00 /nE $500.00 <br /> <br />$124,783.50 <br /> <br />Summary of Bidding: <br /> <br />Total Bid Schedule "A" - <br />Total Bid Schedule "B" - <br />Total Bid Schedule "C" - <br /> <br />$215,626.50 <br /> $45,103.00 <br />$124,783.50 <br /> <br />Total Schedules "AC" - $385,513.00 <br /> <br /> <br />