Laserfiche WebLink
m <br /> <br />12. <br /> <br />13. <br /> <br />14. <br /> <br />15. <br /> <br />16. <br /> <br />17. <br /> <br />18. <br /> <br />19. <br /> <br />20. <br /> <br />21. <br /> <br />22. <br /> <br />23. <br /> <br />Blue Lake Solids Disposal Phase II is for construction of sludge diges- <br />tion, dewatering, and storage. The project is awaiting a construction <br />grant. This project is urgently needed and the MWCC should proceed with <br />Step II construction plans. This is a Service Area No. 4 project. <br /> <br />CAB Interceptor Phase I is being constructed and should be completed by <br />late 1984. This will relieve northwest Minneapolis overflow (Service Area <br />No. 1) and also serve Service Area No. 2, and No. 3 when CAB Interceptor <br />is completed. <br /> <br />Chaska WWTP Expansion. Design in 1984 and construction of larger capacity <br />in 1987 is needed to meet expected increased sewage flow. This is a <br />Service Area No. 4 project. <br /> <br />The Cottage Grove WWTP Expansion Design is scheduled for 1985 and con- <br />struction of larger capacity is scheduled for 1987. The expansion is <br />needed to meet expected increased sewage flow.. This is a Service Area <br />No. 6 project. <br /> <br />The Hastings WWTP Expansion is being constructed now and should be <br />completed by 1985. This is a Service Area No. 6 project. <br /> <br />Gervais Interceptor. Plans are complete. Construction should proceed in <br />1984 provided construction permit is obtained. This is a Service Area <br />).1o. 1 project. <br /> <br />Lino Lakes Interceptor. Plan preparation and construction are on hold <br />until the city has specific timing of local sewerage system construction. <br />Tentative schedule--Design 1984 construction 1984-85. This is a Service <br />No. 2 project. <br /> <br />Lower Belt Line Regulator and Interceptor. Project on hold until NPDES <br />permit is completed and approved allowing facility construction. Plans <br />are complete--tenative construction 1984. This is a Service Area No. t <br />project. <br /> <br />Arden Hills Interceptor. Design plans are scheduled for 1984 and construc- <br />tion is scheduled for late 1984. This facility is being coordinated with <br />city construction of a city facility, so the metro interceQtor will be <br />placed in use in~nediately, after it is constructed. This ~s a Service <br />Area No. 2 project. <br /> <br />Ramsey Interceptor. Design Plans are now in process; construction is <br />scheduled for late 1984. This facility is being coordinated with city <br />construction of a city facility, so the metro interceptor will be placed <br />in use in~ediately after it is constructed. This is a Service Area No. 3 <br />project. <br /> <br />Rosemount WWTP Expansion. The reconstruction of the entire Rosemount WWTP <br />will be designed in 1985 and constructed in 1986 if sewage flow volumes <br />increase as planned. This is a Service Area No. 6 project. <br /> <br />Seneca Sludge Air Floatation Facilities are needed to optimize the present <br />sludge disposal facilities. Design is planned for 1985 and construction <br />is planned for 19B6. This is a Service Area No. 5 project. <br /> <br /> <br />