My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/27/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 09/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:53:09 PM
Creation date
10/26/2016 4:09:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/27/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
f. Name and address of the supplier. <br />g. Name of the manufacturer. <br />h. Number and title of appropriate Specification Section. <br />i. Drawing number and detail references, as appropriate. <br />C. Number of Copies: <br />1. Two (2) copies of the proposed Construction schedule and subsequent revision are required. <br />2. Two (2) copies of the proposed Submittal schedule and subsequent revision are required. <br />3. Three (3) copies of Shop Drawings, Product, Product Samples, Quality Assurance and Quality Control <br />submittals are required. If Contractor requires more than two (2) approved copies, Contractor shall submit <br />additional sets. <br />D. Submittal Transmittal: Package each submittal appropriately for transmittal and handling. Transmit each <br />submittal from Contractor to Engineer using a transmittal form accepted by Engineer. Engineer will not accept <br />submittals received from sources other than Contractor. <br />1. On the transmittal, record relevant information and requests for data. On the form, or separate sheet, record <br />deviations from Contract Document requirements, including variations and limitations. Include <br />Contractor's certification that information complies with Contract Document requirements. <br />3.02 CONTRACTOR'S CONSTRUCTION SCHEDULE <br />A. Bar -Chart Schedule: Prepare a fully developed, horizontal bar -chart -type, Contractor's construction schedule. <br />Provide a separate time bar for each significant construction activity. Engineer shall approve format and level <br />of detail. Update schedules as necessary to reflect current status of work. Submit revised schedules as <br />requested and with each pay application. <br />3.03 SUBMITTAL SCHEDULE <br />A. Concurrently with the development of Contractor's Construction Schedule, prepare and submit a complete and <br />comprehensive schedule of submittals. <br />1. Coordinate Submittal Schedule with the list of subcontracts, Schedule of Values, and the list of products as <br />well as the Contractor's Construction Schedule. <br />2. Prepare the schedule in chronological order, listing each item for which Contractor's shop drawings, <br />product data, samples or other types of submittals are required <br />3.04 SHOP DRAWINGS <br />A. Submit newly prepared information drawn accurately to scale. Highlight, encircle, or otherwise indicate <br />deviations from the Contract Documents. Do not reproduce Contract Documents or copy standard information <br />as the basis of Shop Drawings. Standard information prepared without specific reference to the Project is not a <br />Shop Drawing. <br />B. Shop Drawings include fabrication and installation Drawings, setting diagrams, schedules, patterns, templates <br />and similar Drawings. Include the following information: <br />1. Dimensions. <br />2. Identification of products and materials included by sheet and detail number. <br />3. Compliance with specified standards. <br />4. Notation of coordination requirements. <br />5. Notation of dimensions established by field measurement. <br />6. Sheet Size: Except for templates, patterns and similar full-size Drawings, submit Shop Drawings on sheets <br />at least 8-1/2 inches by 11 inches but no larger than 24 inches by 36 inches. <br />7. Do not use Shop Drawings without an appropriate stamp indicating action taken. <br />Division 1— General Requirements <br />DV 1-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.