My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/27/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 09/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:53:09 PM
Creation date
10/26/2016 4:09:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/27/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02 41 00 <br />BUILDING DEMOLITION AND REMOVAL <br />PART 1-GENERAL <br />1.01 SECTION INCLUDES <br />A. Demolition and removal of buildings <br />B. Removal of bituminous pavement <br />C. Removal of sidewalks <br />D. Removal of concrete curb and gutter <br />E. Removal of parking lot lights <br />F. Removal of trees and buses necessary for the other work <br />G. Removal of sanitary sewer service pipe <br />H. Removal of water service pipe <br />I. Removal of flag pole and base <br />J. Removal of bollards <br />K. Removal of signs <br />L. Removal of landscaping <br />M. Removal of irrigation piping <br />N. Removal of all other miscellaneous site improvements <br />PART 2-PRODUCTS (NOT USED) <br />PART 3-EXECUTION <br />3.01 DEMOLITION AND REMOVAL OF BUILDINGS <br />A. The buildings to be removed are shown on the figures contained in these Contract Documents. The buildings <br />may be demolished prior to removal. <br />B. Building demolition and removal includes all internal and external components, footings, stoops, piping, and <br />other materials as necessary to completely remove the building and all related site improvements. <br />C. The Phase I Environmental Site Assessments included in the attachments identified materials containing <br />asbestos and regulated waste. All items, with the exception of the exterior damp -proofing and roofing cement, <br />have been removed under a separate contract. Under this contact, the Contractor shall remove the following <br />items which are listed in the Asbestos Survey Report and are known to contain asbestos <br />• Exterior damp -proofing <br />• Plastic cement <br />Division 2 — Existing Conditions <br />DV2-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.