My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 09/27/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 09/27/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:53:09 PM
Creation date
10/26/2016 4:09:38 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
09/27/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
601
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 31 14 13 <br />TOPSOIL STRIPPING AND STOCKPILING <br />PART 1— GENERAL <br />1.01 SECTION INCLUDES <br />A. This work consists of salvaging and stockpiling topsoil and excavating suitable topsoil from stockpiles to place <br />on designated areas. <br />1.02 RELATED SECTIONS <br />A. The following is a list of SPECIFICATIONS which may be related to this section: <br />1. Section 31 22 00 Grading. <br />2. Section 31 25 00 Erosion and Sedimentation Controls. <br />PART 2- PRODUCTS <br />2.01 MATERIALS <br />A. Topsoil shall consist of natural onsite ground cover. <br />B. Erosion and Sedimentation Control for Stockpiles shall meet the requirements of Section 31 25 00, Erosion and <br />Sedimentation control. <br />PART 3 - EXECUTION <br />3.01 TOPSOIL <br />A. Topsoil within the limits of the PROJECT shall be salvaged prior to beginning excavating, fill or hauling, <br />operations by excavating topsoil and stockpiling the material for later use. <br />3.02 STOCKPILE <br />A. No soil stockpile shall exceed ten (10) feet in height. <br />B. All topsoil stockpiles shall be protected from sediment transport by surface roughening, watering, and <br />perimeter silt fencing. <br />C. Any topsoil stockpile remaining longer than 7 days shall be seeded with temporary cover or the approved <br />specified final seed mixture. <br />D. Upon completion of PROJECT. Grade stockpile area as necessary for planting or seeding. <br />END OF SECTION <br />Division 31—Earthwork <br />DV31-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.