Laserfiche WebLink
SECTION 31 22 00 <br />GRADING <br />PART 1— GENERAL <br />1.01 SECTION INCLUDES <br />A. Removal and storage of topsoil. <br />B. Removal and storage of gravel. <br />C. Rough Grading. <br />D . Finish grading. <br />1.02 RELATED SECTIONS <br />A. Section 31 14 13 — Topsoil Stripping and Stockpiling. <br />B. Section 31 25 00 — Erosion and Sedimentation Control. <br />C. Section 31 23 33 — Trenching and Backfilling. <br />D. Section 32 92 00 — Turf and Grasses. <br />1.03 UNIT PRICES <br />A. Salvage Topsoil to and From Stockpile: <br />1. Measurement Method: By the cubic yard. <br />2. Includes: Excavating existing topsoil, stockpiling, placing where required, and compacting. <br />1.04 PROJECT CONDITIONS <br />A. Protect above- and below -grade utilities that remain. <br />B. Protect plants, lawns, rock outcroppings, and other features to remain as a portion of final landscaping. <br />C. Protect bench marks, survey control points, existing structures, fences, sidewalks, paving, and curbs from <br />grading equipment and vehicular traffic. <br />PART 2- PRODUCTS <br />2.01 MATERIALS <br />A. On -Site Soil: <br />1. Graded. <br />2. Free of roots, rocks larger than 1/2 inch, debris, large weeds and foreign matter. <br />PART 3 - EXECUTION <br />3.01 EXAMINATION <br />A. Verify that survey bench mark and intended elevations for the Work are as indicated. <br />Division 31— Earthwork <br />DV31-2 <br />