My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/11/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 10/11/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:53:36 PM
Creation date
10/26/2016 9:25:48 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/11/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
510
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works Committee 6. 1. <br />Meeting Date: 09/20/2016 <br />By: Bruce Westby, Engineering/Public <br />Works <br />Title: <br />Staff Updates on Improvement Projects and Items of Interest <br />Purpose/Background: <br />The purpose of this case is to update the Public Works Committee on active and proposed improvement projects <br />within the City, and on other items of interest to the Committee as noted below. <br />MnDOT Improvement Projects <br />• TH 47 at 142nd Avenue <br />• Remove left turns from southbound TH 47 to eastbound 142nd Avenue <br />• Construction started August 22, 2016 and scheduled to be completed by September 25, 2016 <br />• Project web site link: http://www.dot.state.mn.us/metro/projects/hwv47/index.html <br />Anoka County Improvement Projects <br />• CR 116/Bunker Lake Boulevard Pavement Reclamation and Overlay — Ramsey Boulevard to Basalt <br />Street <br />• Existing pavement was reclaimed and overlaid with 4" new pavement <br />• Construction complete (except left/right turn arrows) <br />• CR 83/Armstrong Boulevard Pavement Reclamation and Overlay — 149th Lane to 173rd Avenue <br />• Existing pavement to be reclaimed and overlaid with 4" new pavement <br />• Bypass lanes added at 154th, 157th, and 163rd Avenues <br />• Right turn lanes added at 155th and Tiger Avenues <br />• New striping and signs <br />• Construction scheduled from October 3rd through late October / early November (should not interfere <br />with elections) <br />City Improvement Projects <br />• Business Park 95 Regional Stormwater Pond Improvements <br />• June 28th — Council accepted bids and awarded Construction Contract to New Look Contracting, Inc. <br />• Preconstruction meeting scheduled for September 29, 2016 <br />• Construction scheduled for October 2016 <br />• Andrie Street & 164th Lane Reconstruction <br />• June 23rd — Construction began (3 phases) <br />• Phase 1 - South end of Andrie Street between Alpine Drive and Muirfield Court (1 month) <br />• Phase 2 - North end of Andrie Street between Muirfield Court and 164th Lane (1 month) <br />• Phase 3 - 164th Lane (1 month) <br />• Project completion scheduled for middle to late October 2016, weather depending <br />• 2016 Sealcoat Projects <br />• Sealcoating and first sweeping complete <br />• Second sweeping and striping to occur soon <br />• 2016 Overlay Project <br />• Construction began September 6, 2016 <br />• Project completion by September 27, 2016 <br />• Riverdale Drive Extension - Traprock St. to Ramsey Blvd. <br />• Plans and specifications 95% complete <br />• Parks property appraisal complete — 5.3 acres required road right-of-way appraised at $200,000 <br />
The URL can be used to link to this page
Your browser does not support the video tag.