Laserfiche WebLink
I <br /> I <br />'1 <br /> I <br /> I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> <br /> I <br /> ! <br /> <br />Findings of Fact <br />Flintwood Hills Second Addition <br />Page (4) April 1984 <br /> <br />The major issue with this project is the impact the Ramsey Sanitary <br />Landfill will have on the proposed municipal well. The City's <br />engineering consultants and the Anoka County Environmental Officer <br />evaluated this issue and developed a program for monitoring the <br />migration of leachates from the landfill. This program will be <br />implimented prior to the construction of a municipal well and will be <br />subject to review and approval by the .Minnesota Department of Health. <br />(EAW and Comments to the EAW) <br /> <br />IV. THE EXTENT TO WHICH ENVIRONMENTAL EFFECTS CAN BE ANTICIPATED AND <br /> CONTROLLED AS A RESULT OF OTHER ENVIRONMENTAL STUDIES UNDERTAKEN BY <br /> PUBLIC AGENCIES OR THE PROJECT PROPOSER, OR OF EIS'S PREVIOUSLY <br /> PREPARED ON SIMILAR PROJECTS. <br /> <br />The Metropolitan Council and MWCC have conducted several studies <br />concerning the wastewater treatment needs for this portion of the <br />metropolitan area. <br /> <br />The following is a list of reports relating to construction of <br />Wastewater Facilities which will serve the proposed development: <br /> <br />"CAB Facilities Study Committee Report," Metropolitan <br />Council, May, 1976 <br /> <br />"North Area Sanitary Sewer Study," Metropolitan Council, <br /> prepared by Orr Schelen Mayeron and Associates, November, <br /> 1973 <br /> <br />"Analysis and Treatment at Anoka Wastewater Treatment Plant," <br />Metropolitan Waste Control Commission, September, 1975 <br /> <br />e <br /> <br />"Design Report, Anoka Interceptor," prepared by Short Elliot <br /> Hendrickson, Inc., March, 1978 <br /> <br />"Facilities Planning Report for the Champlin Anoka Brooklyn <br /> Park Interceptor," Metropolitan Waste Control Commission, <br /> prepared by Orr Schelen Mayeron and Associates, March, 1975 <br /> <br />"Review of North Area Sanitary Sewer Study," Metropolitan <br /> Waste Control Commission, prepared by Orr Schelen Mayeron <br />and Associates, Toltz King, Duvall Anderson and Associates, <br />and Consulting Engineers Diversified, December, 1974 <br /> <br />I <br />I <br />I <br /> <br />"Northwest Area Study, Final Report," Metropolitan Waste <br /> Control Commission, prepared by Consulting Engineers <br /> Diversified and CH2 MHill, June, 198~ <br /> <br />In addition to the above, the City of Ramsey has completed the <br />following studies or plans, which address municipal utilities <br />required for the proposed project. <br /> <br /> <br />