Laserfiche WebLink
I <br />I <br /> <br /> I <br /> I <br /> I <br /> I <br /> I <br /> <br /> I <br /> I <br />I <br />I <br /> <br />Mowever, it is mt anticipated that the drainage would czeate any problems, <br />with only oocasicnal flooding of lc~ areas ~ du~lr~ he~v~ rains and <br />durir~ m~ow melt prior to the disappearance of frost in the sprir~. <br /> <br />Some existir~ driveways presently may not have driveway culverts. ~hile not <br />all d~ivew~ys would ~ a driveway culvert, those lots which presently may <br />cause potential floodin~ proble~ns should be requir~3d to install drivewmy <br />culverts. This work is proposed to be done by the owner of the affected <br />property. <br /> <br />COSTS <br /> <br />Estimated costs and estimated quantities are provided in the foltowinU table <br />for the proposed imp~ts. <br /> <br />Item <br /> <br />Bitu~ninous Surfacir~ <br /> <br />Class V Gravel <br /> <br /> Estimated Const~uctic~ Cost - <br /> <br />ESTimATED COSTS <br /> <br /> Estimated Quantity <br /> <br />1,ZOO Tc~s <br />1,800 Tons <br /> <br />Continc3e~ies, ~3ineerir~ g Administrative - <br /> EST/MAT~D~COST - <br /> <br />Estimated Cost <br /> <br /> $51,200.00 <br /> $9,900.00 <br /> $6,625.00 <br /> $47,725.00 <br /> $11,925.00 <br /> $59,650.00 <br /> <br />The above costs are based c~ comst~ion durin~ the early part of 198~. <br /> <br /> <br />