Laserfiche WebLink
m <br /> <br /> E. R. t (ftlled in by EQ8) <br />I ENVIRONMENTAL ASSESSMENT WORKSHEET (EAW) May, 1984' <br /> <br /> NOTE TO REVIEWERS: Written comments should address the accuracy and co~leteness of the <br />mE'AW information, potential impacts that warrant investigation and/or the need for <br /> an <br /> EIS. Such conments mist be submitted to the Responsible Government Unit (RGU) during the <br /> 30 day period following notice of the EAW's availability in the EQB Monitor..Contact the <br />m E <br /> QB (612/296-3985) or the RGU to find out when the 30 day comment period ends. <br /> <br /> INSTRUCTIO)4S: Guidelines for assisting in completion of this worksheet may be obtained <br /> T-~-~"E1)~-~P-rovtde all information which is reasonably accessible. Attach additional <br /> sheets if necessary. EXPLAIN ALL ANSWERS. <br /> <br />m <br /> <br />Project Name R~msey Second Interceptor M~CC 83-62 <br /> <br /> m <br /> <br /> Co~u~ission <br />Contact Person Kenneth M. Bombach <br /> <br />3. RGU MN Pollution Control Agency <br /> <br />Contact Person Eric J~ K/lbera <br /> <br />9/1/82 <br /> <br /> I <br />I <br />I <br />I <br />I <br /> <br />Address 350 Metro Square Bldq. <br /> <br />Address 1935 West Co. Road ~.~ <br /> <br /> St. Paul, MN 55101 <br />Phone 612/222-8423 <br /> <br />.. Rosev$11e, .MN 55113 <br /> <br />Project Location: .. 1/4__ <br /> <br /> Phone. 612/296-7795 <br /> <br />~4 Section25 & 36 Township 32N <br /> <br />Range..25W <br /> <br />a. County/Name Anoka <br /> <br />Ctty/Township(s)/Name R~msey, Anoka <br /> <br />b. Attach each of the following to the EAW: <br /> <br />a county map showing the general area of the project. Figure 1 <br /> <br />a copyjies) of USGS 71~ minute, 1:24,000 scale map or other maps, <br />diagrams or aerial photos which clearly indicate the specific boun- <br />daries and topography of the project site. Figure 2 <br /> <br /> 3. a site plan showing the location of significant features such as pro- <br /> posed structures, roads, extent of floodplain, wetlands, wells, etc. <br /> Figures 3 and 4 <br /> 4. an existing land use map, and if available, a zoning map of the immed- <br /> iate area. Figures 5 and 6 <br /> <br />Describe the proposed project (what will be done and how long ~t will take). <br /> <br />See page la. <br /> <br />Reason for EAW preparation: . mandatory, category, <br /> <br />Estimated construction cost $8oo,ooo <br /> <br /> 6 MC~R <br />MEQB Rule # ~3.03~.2 <br /> <br /> <br />