My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 03/25/1986
Ramsey
>
Public
>
Agendas
>
Council
>
1986
>
Agenda - Council - 03/25/1986
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 8:28:46 AM
Creation date
7/15/2004 9:11:35 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
03/25/1986
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
232
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />i <br />I <br />i <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />IV. <br /> <br />The costs of the proposed streets with the exception of <br />Dysprosium Street will be assessed to development on a unit <br />basis. The cost of Dysprosium Street will be financed by <br />MSA Funds and an assessment to the quad lots. The <br />assessment to the quad lots would be equal to fifty percent <br />of the cost of a typical residential street. <br /> <br />ESTIMATED COSTS <br /> <br />The estimated project costs presented herein reflect the con- <br />struction costs and overhead costs. Construction costs are esti- <br />mated contract amounts for the actual construction. Right-of-way <br />costs were not included since it is proposed to utilize dedicated <br />rights-of-way. Overhead costs include, but are not limited to, <br />engineering, construction staking and inspection, administrative <br />service, legal, interest during construction and contingency. <br />Overhead costs for the project shown at the conclusion of each <br />schedule summary are estimated based on percentages of construc- <br />tion cost. Those percentages are estimated to be as follows: <br /> <br />Engineering 8% <br /> <br />Staking & Inspection 7% <br /> <br />Bonding & Legal 1% <br /> <br />city Staff Administration 5% <br />Contingencies 5% <br /> <br />Interest During Construction 4% <br /> <br />6 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.