My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 10/25/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 10/25/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:53:58 PM
Creation date
11/23/2016 1:34:02 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
10/25/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
479
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
numerous property owners who attended and provided comments at the various public input meetings and City <br /> Council meetings that were conducted during development of this project. The owners generally voiced a desire to <br /> keep street widths as narrow as practical to minimize traffic speeds and to prevent the loss of mature boulevard <br /> trees along the corridor.A further consideration was the requirement to meet minimum MnDOT State Aid <br /> standards. The existing 66 foot wide right-of-way along both street segments was not modified. <br /> B618 concrete curb and gutter was constructed in place of the previous surmountable bituminous curb. The new <br /> pavement section was constructed using 3'/2 inches of bituminous pavement over 6 inches modified class 5 <br /> aggregate base,meeting MnDOT State Aid standards for a 9-ton pavement rating. The improved streets are <br /> anticipated to have a 60 year life, assuming regular maintenance operations will be completed at prescribed <br /> intervals. <br /> Storm sewer system improvements, in addition to the use of concrete curb and gutter,included removal of existing <br /> catch basins,manholes, and pipes within the streets, and installation a more robust storm sewer system that can <br /> more effectively drain runoff from the streets due to stormwater and irrigation systems. The new storm sewer <br /> improvements meet MnDOT State Aid standards for pavement spread and pipe capacities. <br /> A parking lane is now designated along the east side of Andric Street and the north side of 164th Lane using 4" <br /> solid white pavement striping. The opposing sides of the streets are signed"NO PARKING"using a minimal <br /> number of signs that are placed as discretely as possible,primarily along property lines, to minimize visibility when <br /> looking out windows.No centerline or edge stripes were placed with this project. <br /> Public utilities do not exist within these street corridors and no plans exist to serve this area with public utilities so <br /> sanitary sewer and watermain improvements were not completed with this project. <br /> Notification: <br /> Notice for this Assessment Hearing was published in the City's official newspaper,the Anoka Union Herald, on <br /> Friday, September 30th,and individual Assessment Hearing notices were mailed to all property owners proposed to <br /> be assessed for the improvements as required per Minnesota State Statute Chapter 429. Attached is a copy of the <br /> Assessment Hearing Notice mailed to residents. <br /> Anoka County requires that assessments be certified to the County Auditor by November 30th for collection on next <br /> year's taxes. This deadline will be met by conducting the Assessment Hearing on October 25th. <br /> Observations/Alternatives: <br /> Observations: <br /> Proposed Final Assessments <br /> The final proposed assessment amount for this project is$6,636.40 per each of the sixty five (65)benefiting <br /> properties,which totals $431,366. Each of the properties proposed to be assessed has their primary access onto the <br /> improved section of Andric Street or 164h Lane.The preliminarily approved assessment was set at$9,150 per <br /> property. <br /> The proposed final assessment is intended to recover 25%of eligible project costs per the City's adopted Special <br /> Assessment Policy. Since each property proposed to be assessed received the same level of benefit the proposed <br /> assessment rate was applied equally to each benefiting property using the"per lot"assessment method as allowed <br /> per the City's adopted Special Assessment Policy. The proposed special assessments conform to the requirements <br /> set forth in State Statute Chapter 429,chapter 8 of the City Charter,applicable City code,and the City's adopted <br /> Special Assessments Policy,which are attached to this case for reference. <br /> Attached are copies of the final assessment map and roll for this project. <br /> The proposed interest rate for special assessments is 3.75%,and assessments are proposed to carry a 10 year term. <br /> The attached hearing notice includes a schedule of payment showing annual payments including principal and <br /> interest. <br />
The URL can be used to link to this page
Your browser does not support the video tag.