Laserfiche WebLink
No assessment deferrals have been requested,or are being proposed with this project. <br /> Public Comment <br /> Attached is a document containing City staff responses to public comments received regarding special assessments <br /> for this project, as well as several frequently asked questions regarding special assessments. <br /> Alternatives: <br /> Alternative#1 —Motion to adopt Resolution#16-10-202 adopting the assessment roll certifying assessments for <br /> Andric Street and 164th Lane Reconstruction,Improvement Project 16-00 Division C. <br /> Alternative 42—Motion to deny adoption of Resolution#16-10-202 at this time. <br /> Funding Source: <br /> This improvement project is included in the City's 5-year Capital Improvement Plan for construction in 2016. <br /> Funding is proposed to include a combination of street reconstruction bond funds, special assessments to benefiting <br /> properties,and stormwater utility funds. <br /> Construction is not yet complete but the project will be substantially complete within the next few weeks. However, <br /> since the vast majority of work is complete and because the remaining work is easily quantifiable, Staff is confident <br /> the final construction costs will be very close to the project bid price of$1,568,162.65. Final project costs will be <br /> presented in detail at the time that Council is requested to approve final payment,but this will not occur until next <br /> year to allow time to verify that turf establishment was completed properly,and to allow approval of all punch list <br /> work items following final inspection in the spring.Final project costs are estimated to be$1,929,000 which <br /> includes indirect costs for administration, engineering, finance and legal fees estimated at 23%of construction <br /> costs. <br /> A detailed breakout of project costs will be presented during the Assessment Hearing. <br /> Special assessments for this project are based solely on eligible project costs which do not include costs related to <br /> oversizing the existing street,either in width or pavement thickness, as required to meet MnDOT State Aid <br /> standards. Estimated costs required for oversizing the streets to meet State Aid standards,which includes costs to <br /> widen the street by 2 feet and to increase the pavement section to a 9-ton design, total$203,358.75 based on bid <br /> prices. The estimated assessable project cost per bid prices is therefore $1,725,481.31. This results in a total project <br /> assessment amount of$431,366 based on 25%of eligible project costs. This assumes final project costs will be <br /> equal to bid prices and that assessments are approved by Council at 25%of final eligible construction costs. The <br /> preliminarily approved assessment amount was $9,150 per parcel. <br /> The special benefit consultation report completed for this project by the firm of Patchin Messner Dodd&Brumm <br /> anticipates that properties benefiting from the improvements and proposed to be assessed will be enhanced in value <br /> by approximately$8,500 to$9,500 per property.A copy of this report will be available at the Assessment Hearing <br /> on October 25th. <br /> Recommendation: <br /> Staff recommends Council approval of alternative 41. <br /> Action: <br /> Approve or deny adoption of Resolution 916-10-202 adopting the assessment roll certifying assessments for Andric <br /> Street and 164th Lane Reconstruction,Improvement Project 16-00 Division C. <br /> Attachments <br />