Laserfiche WebLink
Special Assessment Questions and Responses October 24, 2016 <br /> The following questions (see bold text) related to special assessments for the Andrie Street and 164th <br /> Lane Reconstruction project were received by City staff. Some questions were modified for clarity and <br /> brevity. Staff's responses follow each question. <br /> <Email received October 8,2016> <br /> Would you please forward either a copy of the independent appraisal(s) or a link to it prior to the <br /> October 25th meeting? <br /> The City does not complete independent appraisals for each property as part of our street <br /> reconstruction program. Instead, we hire appraisers to prepare a Special Benefit Consultation Report. <br /> This report utilizes a sales comparison approach that investigates and analyzes the probable special <br /> benefit that will be derived from the project based on before and after sales prices of similar properties <br /> in the Twin Cities metro area that are located on similar streets that were recently reconstructed. In <br /> summary, the draft Special Benefit Consultation Report prepared for this project concludes to a range of <br /> anticipated special benefit between $8,500 and $9,500 per property. <br /> (A pdf copy of the report was provided to this property owner via email.) <br /> <Email received October 19,2016> <br /> A Total Project Cost Statement identifying which costs are"City Costs" and "Assessable Costs". <br /> "City costs" include all costs related to oversizing the street to meet State Aid standards including <br /> widening the street 2 feet and increasing the structural capacity of the pavement section to meet a 9- <br /> ton design. These costs are estimated to be $203,359. All other costs are considered "assessable costs". <br /> Identify separately all costs associated with the storm sewer work. <br /> Please see yellow highlighted rows on the attached bid tabulation. (All storm sewer costs highlighted in <br /> yellow totaled$235,775.29) <br /> Month and year Andrie and 164`"were constructed. <br /> Andrie Street and 164th Lane were constructed in 1985. Typically such work occurs between June and <br /> October. <br /> Identify separately all costs associated with the trail reconstruction parallel to Alpine. <br /> Please see pink highlighted rows on the attached bid tabulation. Approximately 75% of these costs are <br /> applicable to the Alpine Drive trail. (All trail reconstruction costs highlighted in pink totaled$4,926.25) <br /> <Below are responses submitted via email by staff to the same property owner above in follow up to <br /> questions posed on October 18`h during a meeting between the property owners and the City Engineer <br /> and City Administrator> <br /> Storm Sewer Assessment — The proposed final assessment amount does include all storm sewer costs. <br /> The City Charter does not prohibit assessments for storm sewer improvements. The City's adopted <br /> Special Assessments Policy identifies storm sewer improvements as eligible for special assessments in <br /> Section 2, storm sewer costs are not identified as a "city cost" in Section 6, and Section 10.0 states that <br /> storm sewers are assessed on a project-by-project basis, although the last sentence of Section 10 states <br /> Page 1 of 3 <br />