Laserfiche WebLink
B R E N N A N COMPANIES Z'afterineg.Solving.Leading, <br /> 124 Cart:Walnut Sheet,Sutte 20,Mankato,MN 56001 <br /> BRE<NNAN CONSTRUCTION I BRENNAN PROPERTIES P507:625.5417 P607.526.4905 11bxonnanobcolmn.coen <br /> MEMORANDUM <br /> TO: Bruce Schwartzman <br /> CC: Scott Jones <br /> FROM: Joe Brennan <br /> DATE: 7/26/2016 <br /> RE: Ramsey Fire Station#2- PR 17 <br /> Bruce, <br /> Below is the breakdown of work scope changes resulting in contract amount modifications. <br /> Item 1: Leave 8 new cedar/pine trees in lieu of transplanting 8 existing trees. PR 17 cover <br /> sheet incorrectly states that 15 trees should be considered-L101 identifies 8 transplanted <br /> trees. <br /> Item Description Unit Price • Labor <br /> Subcontractor: <br /> N/A $0.00 <br /> Brennan Construction: <br /> Supervision $70.00 0,0 <br /> Carpentry $65.00 0.0 $0,00 <br /> Bond 1% $0.00 <br /> Tree adjustment ($1,000:00) <br /> Notes: RS Means 2016 32 96 23.43 "Moving Trees" 0300 Sub Total $0,00 $0,00 <br /> identifies the transplant cost of$510/tree. Assumed value 5%OH&P $0.00 $0.00 <br /> of 6' new tree is$450/tree, ($510-$450)x 8=$480. GC Total $0.00 ($11000:00) <br /> 10%OH&P $0;00 N/A <br /> TOTAL $0 ($1,000) <br /> Approved: Date: L <br />