My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 11/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:54:50 PM
Creation date
11/23/2016 3:40:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 02 4100 <br /> BUILDING DEMOLITION AND REMOVAL <br /> PART 1-GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Demolition and removal of buildings <br /> B. Removal of bituminous pavement <br /> C. Removal of sidewalks <br /> D. Removal of concrete curb and gutter <br /> E. Removal of parking lot lights <br /> F. Removal of trees and bushes necessary for the other work <br /> G. Removal of sanitary sewer service pipe <br /> H. Removal of water service pipe <br /> I. Removal of flag pole and base <br /> J. Removal of bollards <br /> K. Removal of signs and foundations <br /> L. Removal of landscaping <br /> M. Removal of irrigation piping <br /> N. Removal of all other miscellaneous site improvements as necessary <br /> O. Removal of storm sewer pipe <br /> PART 2-PRODUCTS(NOT USED) <br /> PART 3-EXECUTION <br /> 3.01 DEMOLITION AND REMOVAL OF BUILDINGS <br /> A. The buildings to be removed are shown on the figures contained in these Contract Documents. The buildings <br /> may be demolished prior to removal. <br /> B. Building demolition and removal includes all internal and external components, footings, stoops, piping, and <br /> other materials as necessary to completely remove the buildings and all related site improvements. <br /> C. The Asbestos Survey Reports included in the attachments identified materials containing asbestos and regulated <br /> waste. All items, with the exception of the exterior damp-proofing and roofing plastic cement, have been <br /> removed under a separate contract. Under this contact,the Contractor shall remove the following items which <br /> are listed in the Asbestos Survey Report and are known to contain asbestos <br /> • Exterior damp-proofing <br /> • Plastic cement <br /> Division 2—Existing Conditions <br /> DV24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.