My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Council - 11/22/2016
Ramsey
>
Public
>
Agendas
>
Council
>
2016
>
Agenda - Council - 11/22/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2025 3:54:50 PM
Creation date
11/23/2016 3:40:26 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Council
Document Date
11/22/2016
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
564
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 3122 00 <br /> GRADING <br /> PART 1 —GENERAL <br /> 1.01 SECTION INCLUDES <br /> A. Rough Grading. <br /> B. Finish grading. <br /> 1.02 RELATED SECTIONS <br /> A. Section 31 14 13—Topsoil Stripping and Stockpiling. <br /> B. Section 3125 00—Erosion and Sedimentation Control. <br /> C. Section 3123 33—Trenching and Backfilling. <br /> D. Section 32 92 00—Turf and Grasses. <br /> 1.03 PROJECT CONDITIONS <br /> A. Protect above-and below-grade utilities that remain. <br /> B. Protect plants,lawns, trees,and other features to remain as a portion of final landscaping. <br /> C. Protect items not intended for removal. <br /> PART2-PRODUCTS <br /> 2.01 MATERIALS <br /> A. On-Site Soil <br /> PART 3-EXECUTION <br /> 3.01 EXAMINATION <br /> A. Verify that survey bench mark and intended elevations for the Work are as indicated. <br /> 3.02 PREPARATION <br /> A. Identify required lines,levels, contours,and datum. <br /> B. Stake and flag locations of known utilities. <br /> C. Locate,identify,and protect utilities that remain,from damage. <br /> 3.03 ROUGH GRADING <br /> A. Remove topsoil from areas to be further excavated, re-landscaped, or re-graded, without mixing with foreign <br /> materials. <br /> B. Do not remove topsoil when wet. <br /> C. Remove subsoil from areas to be further excavated,re-landscaped, or re-graded. <br /> Division 31—Earthwork <br /> DV31-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.