My WebLink
|
Help
|
About
|
Sign Out
Home
Agenda - Parks and Recreation Commission - 10/13/2016
Ramsey
>
Public
>
Agendas
>
Parks and Recreation Commission
>
2016
>
Agenda - Parks and Recreation Commission - 10/13/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2025 12:50:40 PM
Creation date
12/2/2016 9:27:28 AM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Meeting Type
Parks and Recreation Commission
Document Date
10/13/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRUCE JACOBSON <br /> Landscape Architect <br /> Proposal+ Scope of Services <br /> Project: Ramsey COR 'Lake Ramsey Commons' Schematic Design <br /> Client: City of Ramsey <br /> Primary Consultant: Bruce Jacobson (Project Number: BJLArch 16-0121) <br /> Sub-Consultant: Ten x Ten Studio (Satoko Muratake) <br /> Date: 8/8/2016 <br /> Overview <br /> The City of Ramsey, through Mark Riverblood, their Parks and Public Works Assistant Superintendent, <br /> invited Bruce Jacobson to submit this proposal to provide Landscape Architectural consulting for the <br /> above referenced project. Based on recent conceptual design study for the 'Lake Ramsey Commons' <br /> (described in the COR Parks+ Public Places—Public Realm Framework document dated January 2016), <br /> he has outlined the specific tasks needed to translate existing concept ideas into a detailed Schematic <br /> Design plan set. The work will help guide further detailed design, and near-term excavation of the site <br /> for needed fill material, leading to additional (future) park improvements at this location within the COR. <br /> Scope of Services <br /> Bruce will facilitate a series of workshops with Mark Riverblood, and other City Department Leaders (as <br /> needed and directed by Mark), to complete further refinements to the existing Lake Ramsey Commons <br /> Concept according to the tasks, meetings and deliverables outlined in the following Work Plan: <br /> Task 1—Project Start Up (concurrent with Task 2) <br /> • Confirm study area <br /> • Create base map <br /> • Confirm outcomes/ level of detail/deliverables <br /> Meetings: 2 Consultant Team; 1 City Review (admin +start up information) <br /> Deliverables: Summary Memorandum (objectives +final deliverables) <br /> Task 2—Preliminary Design Program (concurrent with Task 1) <br /> • Confirm use areas/ user groups <br /> • Confirm desired amenities/facilities <br /> • Confirm infrastructure needs <br /> Meetings: 2 Consultant Team; 1 City Review (design program) <br /> Deliverables: Summary Memorandum (preliminary design program) <br /> Task 3—Refined Concept <br /> • Quick sketch studies; confirm relative size/ location/connections <br /> • Confirm overall character/materials options <br /> • Provide precedent project images to illustrate ideas <br /> • Facilitate discussion to synthesize design ideas into Preferred Concept Plan <br /> • Facilitate discussion to define realistic project phases and Final Phasing Plan <br /> Meetings: 2 Consultant Team; 2 City Review (1st—concept studies; 2nd— preferred plan/phasing) <br /> Deliverables: Summary Memorandum (concept studies+ Preferred Concept Plan + Phasing Plan) <br />
The URL can be used to link to this page
Your browser does not support the video tag.