My WebLink
|
Help
|
About
|
Sign Out
Home
11/03/16
Ramsey
>
Economic Development Authority
>
Full Agendas
>
2010's
>
2016
>
11/03/16
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/2/2016 9:54:48 AM
Creation date
12/2/2016 9:54:14 AM
Metadata
Fields
Template:
Full Agenda
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• Anoka County: Work in Right of Way, and <br /> • Lower Rum River Watershed Management Organization: Storm Water. <br /> Both MnDOT and Anoka County were engaged during the study process. While MnDOT <br /> responded they did not have any comments on a preliminary version of the report, Anoka <br /> County provided feedback on traffic related issues. Anoka County's comments have been <br /> included in this report. <br /> Recent Improvements <br /> Improvements to the area were completed in 2011. The street and utility improvements <br /> completed at that time included: <br /> • Extension of sanitary sewer along the west side of Armstrong Boulevard from just north <br /> of Sunwood Drive to Bunker Lake Boulevard, <br /> • Extension of watermain from the east side of Armstrong Boulevard to the west side of <br /> Bunker Lake Boulevard, <br /> • Extension of sanitary sewer and watermain in newly platted Bunker Lake Boulevard <br /> right-of-way, <br /> • Development of a storm sewer system to service the street and right-of-way <br /> requirements, <br /> • Extension of Bunker Lake Boulevard roadway, <br /> • Paving of Puma Street, and <br /> • Extension of a bituminous trail along Puma Street from Bunker Lake Boulevard to Alpine <br /> Drive. <br /> All of the improvements completed at that time were consistent with the City's Comprehensive <br /> Plans. <br /> UNDERSTANDING PREVIOUS IMPROVEMENTS <br /> Significant consideration and planning was completed prior to completion of the improvements <br /> constructed in 2011. Understanding the thoughts behind previous improvements can help avoid <br /> omissions when considering future improvements. <br /> Street and Trail Improvements <br /> Bunker Lake Boulevard <br /> The previous improvements provided a two-lane roadway from Armstrong Boulevard to Puma <br /> Street. The roadway was designed to allow for future widening and expansion as development <br /> and other potential transportation improvements surrounding the area increased traffic on this <br /> Prepared by: Bolton & Menk, Inc. UNDERSTANDING PREVIOUS IMPROVEMENTS <br /> City of Ramsey— Future Business Park Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.