Laserfiche WebLink
These types of improvements are typically inspected by the City for conformity with applicable codes <br /> and standards, but are constructed by the property owner. <br /> Figure 17 depicts the lots considered for this report and also provides additional information related to <br /> each lot. Similar information is presented in the following table: <br /> Identification Zoning Gross Area Adjusted <br /> Number Classification (Acres) Frontage (Ft) <br /> Phase 1 <br /> 8 E-2 Employment District 24.801 1,343 <br /> 9 B-2 Business District 9.628 1,261 <br /> 10 COR 7.507 1,263 <br /> Phase 1 Totals 41.936 3,867 <br /> Phase 2 <br /> 2 E-2 Employment District 20.252 489 <br /> 6 R-2 High Density Residential 3.000 353 <br /> 7 E-2 Employment District 20.307 1,358 <br /> Phase 2 Totals 43.559 2,200 <br /> Phase 3 <br /> 1 R-2 Medium Density Residential 38.915 1,289 <br /> 2 E-2 Employment District 28.612 958 <br /> 3 R-1 M USA 4.107 419 <br /> 4 R-1 M USA 30.508 683 <br /> Phase 3 Totals 102.141 3,349 <br /> Not Included in Calculations <br /> 5 Public/Quasi-Public 86.422 3,488 <br /> Totals all Phases 274.064 12,904 <br /> The zoning classifications listed in the table above are based on anticipated future zoning for the study <br /> area. Gross areas and frontages are based on GIS information and will most likely be refined during <br /> subsequent phases of project development. <br /> Several of the parcels were previously assessed for improvements constructed in 2011.The <br /> improvements made previously were in direct benefit to parcel 5 to allow for development. Although <br /> development did not occur at that time, no further improvements will be required to serve that parcel. <br /> Parcel 5 was therefor excluded from calculations that follow. A portion of the improvements will be paid <br /> by the City either through utility funds or other means. A list of assumptions is as follows: <br /> • All trunk water and sanitary sewer system costs will be paid for through the City utility funds, <br /> Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES <br /> City of Ramsey— Future Business Park Page 13 <br />