• Assessments will be made to benefitting properties as each phase is constructed, <br /> • Three standard methods of assessments were analyzed including: Frontage,Area, and Per Lot. <br /> • The City's existing assessment policy very closely matches the Frontage method, and <br /> • Gross acreage was used in lieu of net developable acreage in the calculations below. <br /> • Lot 6 was assessed by the short side of the lot. Lots 9 and 10 abut Armstrong Boulevard, a <br /> County roadway, and will access off of Bunker Lake Boulevard. Lot 7 abuts a portion of the Puma <br /> Street right of way that is anticipated to be vacated. Lots 1, 3 and 4 abut Alpine Drive, but access <br /> will be limited to Puma Street. <br /> The table below depicts a distribution based on all costs being assessed to the benefitting properties. <br /> We have assumed for this analysis the costs would be assessed to properties benefitting from each <br /> phase of construction. For instance, properties directly benefitting from Phase 1 improvements would <br /> be assessed for Phase 1 costs at the time of Phase 1 improvements. Some lots benefit from more than <br /> one phase of construction and would be assessed as future phases are constructed. <br /> Calculations were based on the areas and front footages (shown on page 12), along with the costs per <br /> phase (shown on page 10).Trunk sanitary sewer and trunk watermain were considered City costs and <br /> were not included in the calculations. For comparison, a summary of the unit costs used in the <br /> calculations is presented below: <br /> Frontage Area Per Lot <br /> Method Method Method <br /> Phase (Cost/FF) (Cost/Acre) (Cost/Lot) <br /> 1 $ 462.89 $42,685.11 $ 596,700 <br /> 2 $ 742.27 $ 37,489.38 $ 544,400 <br /> 3 $ 594.51 $ 19,492.66 $ 497,800 <br /> Based on the above cost distribution, the potential assessments per lot per phase is depicted below: <br /> Identification Frontage Area Per Lot <br /> Number Method Method Method <br /> Phase 1 <br /> 8 $ 621,700 $ 1,058,600 $ 596,700 <br /> 9 $ 583,700 $ 411,000 $ 596,700 <br /> 10 $ 584,600 $ 320,400 $ 596,700 <br /> Phase 1 Totals $ 1,790,000 $ 1,790,000 $ 1,790,100 <br /> Phase 2 <br /> 2 $ 363,000 $ 759,300 $ 544,400 <br /> 6 $ 262,000 $ 112,500 $ 544,400 <br /> 7 $ 1,008,000 $ 761,200 $ 544,400 <br /> Phase 2 Totals $ 1,633,000 $ 1,633,000 $ 1,633,200 <br /> Prepared by: Bolton & Menk, Inc. COST ALLOCATION ALTERNATIVES <br /> City of Ramsey— Future Business Park Page 14 <br />