My WebLink
|
Help
|
About
|
Sign Out
Home
10/09/85
Ramsey
>
Public
>
Dissolved Boards/Commissions/Committees
>
Economic Development Commission
>
Agendas
>
1985
>
10/09/85
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/13/2025 11:42:55 AM
Creation date
7/26/2004 1:14:11 PM
Metadata
Fields
Template:
Meetings
Meeting Document Type
Agenda
Document Title
Economic Development Commission
Document Date
10/09/1985
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
110
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br /> <br />-5- <br /> <br /> 7. ,,Purpose of A~reement. The purpose of this Agreement is to resolve <br />the violations alleged ill paragraph A.6. <br /> <br /> B. AGREEMENT <br /> <br /> NOW, THEREFORE, it is hereby agreed and stipulated as follows: <br /> <br /> 1. Compa ny. <br /> <br /> a. On or before August 1, 1985, the Company shall submit to the <br /> <br />EPA, Region V, the Notification of Hazardous Waste Activity Form (EPA Form <br />8700-12) to obtain the required generator identification number. <br /> <br /> b. On or before August 1, 1985, the Company shall: <br /> <br /> -' ) Examine all waste storage containers and repackage the wastes <br />into. DOT..approved,containers if necessary to prevent leaks or spills. ,. <br /> <br /> (2) Close and properly mark and label all containers of hazardous <br />waste. ,~ <br /> <br /> (3) Provide a storage area for hazardous wastes which meet the <br /> <br />requirements of Plinnesota Rules pt. 7045.0292. <br /> <br /> c. On or before August 1, 1985, the Company shall provide adequate <br /> spill control equipment. <br /> <br /> d. On or before September 3, 1985, the Company shall evaluate all <br />wastes generated including process waste water discharged to the drainfie)d and <br />de~ermine their hazardous or nonhazardous nature. <br /> <br /> e. On or before September 3, 19t)5, the Company shall complete and <br /> submit to the Agency for approval a written proposal from a qualified consultant <br /> to co~duct a study which will address the potential soil and ground water con- <br /> tamin~tion of the sump and drainfield area. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.