Laserfiche WebLink
I <br /> I <br /> I <br /> I <br /> i <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br /> I <br />I <br />I <br />I <br />I <br />I <br /> <br />IV. <br /> <br />As an interim solution to the problem, it is proposed to con- <br />st~uct s culvert across 150th Lane N.W. as shown on Exhibit A, <br />This culvert would be set at the high water levei as determined <br />by the Department of Natural Resources (DNR). The proposed <br />culvert would not lower the existing water level. Bowever, it <br />would regulate the water elevation at the high water level as <br />determined by the DNR. It is also proposed to clean the drainage <br />channel between 150th Lane N.W. and 149th Lane ~.W. to allow <br />water to flow from the north pond to the south pond. It should <br />be noted that this is only an interim solution and in the event <br />of a 100-year frequency storm, the water level in the south pond <br />could exceed the water level in the north pond. Therefore, we <br />would recommend a flap gate be provided on the proposed culvert <br />in 150th Lane N.W. to prevent water in the south pond from <br />flowing to the north pond. <br /> <br />ESTIMATED COSTS <br /> <br />Estimated costs are provided below for the proposed improvement: <br /> <br />COST SUMMARY <br /> <br />I tern <br /> <br />Culvert Installation <br />Channel Cleaning <br />Street Restoration <br />Channel Restoration <br /> Estimated Construction Cost <br /> <br />Construction Overhead Costs <br />- Engineering 15% <br />- Staking & Inspection 5% <br />- Bonding & Legal 5% <br />- City Staff Administration 5% <br />- Contingencies 5% <br /> Total Estimated Project <br /> <br />Estimated Cost <br /> <br />$1,600.00 <br />$2,800.00 <br /> $600.00 <br />$1,000.00 <br /> <br />$6,000.00 <br /> <br />$900.00 <br />$300.00 <br />$300.0O <br />$300.00 <br />$300.00 <br />$8,100.00 <br /> <br />3 <br /> <br /> <br />